Hawaii Administrative Rules
Title 12 - DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS
Subtitle 8 - HAWAII OCCUPATIONAL SAFETY AND HEALTH DIVISION
Part 10 - BOILER AND PRESSURE VESSEL
Chapter 222.1 - POWER BOILERS
Section 12-222.1-4 - Inspections
Current through August, 2024
(a) Initial power boiler acceptance inspections shall be conducted and witnessed by an inspector employed by the department. The initial inspection shall include internal inspection, post installation pressure test in accordance with the original code of construction, and operational testing of controls and safety devices by the installer, contractor, or owner. The tests shall conform to the procedures set forth in the ASME BPVC, NBIC, and this section.
(b) All power boilers require annual inspection, including an internal inspection, and if approved by the department, the owner or user shall receive an operating permit. Approximately six (6) months after an initial or annual inspection, power boilers shall be externally inspected and operationally tested. The owner or user or designee shall perform the operational testing with an inspector witnessing the testing.
(c) The owner or user or designated agent shall prepare each boiler for internal inspection prior to the expiration date of the operating permit and shall apply a hydrostatic or pressure test, whenever necessary, at a time mutually agreeable to the inspector and owner or user. The owner or user of a boiler, or designated agent, shall prepare the boiler or pressure vessel for internal inspection to include, but not limited to the following, at the discretion of the inspector:
(d) The following shall apply to these specific types of boilers or pressure vessels:
(e) Additional inspection requirements: