(a) The director
shall prepare a fact sheet for every draft permit for a major facility or
activity, for every class I sludge management facility, for every draft permit
that incorporates a variance or requires an explanation under
40
CFR §
124.56(b), and
for every draft permit which the director finds is the subject of widespread
public interest or raises major issues. The director shall send the fact sheet
to the owner or operator, its authorized representative, and, upon request, to
any other person.
(b) Fact sheets
shall include at least the following information:
(1) A sketch or detailed description of the
location of the discharge described in the NPOES permit application; a brief
description of the type of facility or activity which is the subject of the
draft permit;
(2) A quantitative
description of the discharge described in the NPDES permit application which
includes at least the following:
(A) The rate
or frequency of the proposed discharge; if the discharge is continuous, the
average daily flow in gallons per day or million gallons per day or cubic feet
per second;
(B) For thermal
discharges subject to limitation under the Act, the average summer and winter
temperatures in degrees Fahrenheit or Celsius; and
(C) The average daily discharge in pounds per
day of any pollutants which are present in significant quantities or which are
subject to limitations or prohibition under Sections 301, 302, 306, or 307 of
the Act,
33 U.S.C. §§
1311,
1312,
1316
or
1317,
and regulations published under those sections;
(3) The tentative determinations required
under section 11-55-08;
(4) A brief
citation, including a brief identification of the uses for which the receiving
State waters have been classified, of the water quality standards, and effluent
standards and limitations applied to the proposed discharge;
(5) A more detailed description of the
procedures for the formulation of final determinations than that given in the
public notice including:
(A) The thirty-day
comment period required by section 11-55-09(b);
(B) Procedures for requesting a public
hearing and the nature thereof; and
(C) Any other procedures by which the public
may participate in the formulation of the final determinations;
(6) The name and telephone number
of a person to contact for additional information; and
(7) The information required by 40 C FR
§§124.8(b) (5 ), 124.56 (a), 124.56(b), 124.56(c), 124.56(e), and
Part 125, subpart M.
(c)
The director shall add the name of any person or group upon request to a
mailing list to receive copies of fact sheets.