Compilation of Rules and Regulations of the State of Georgia
Department 620 - RULES OF GEORGIA STRUCTURAL PEST CONTROL COMMISSION
Chapter 620-6 - WOOD DESTROYING ORGANISMS
Rule 620-6-.02 - Contracts
Current through Rules and Regulations filed through September 23, 2024
(1) Every licensee shall issue a written contract to the property owner or owner's agent covering each job of Wood Destroying Organisms Control, setting forth the following:
(2) Every Wood Destroying Organism Control contract shall be signed by the property owner or owner's agent prior to performance of any control measures and the three (3) day right of cancellation shall be disclosed to every contractee in accordance with the Fair Business Practices Act of 1975, and rules of the Federal Trade Commission, 16 C.F.R. 429.
(3) Every Wood Destroying Organism Control contract for treatment which utilizes a bait or baiting system shall contain the following statement in at least one-eighth (1/8) inch letters and blocked in with a heavy black line "The removal of the bait or baiting system may result in a lack of termite protection".
(4) Subterranean termite control warranty only contracts may not be issued in place of a pre-construction treatment for subterranean termite control. These contracts shall be limited to one and two family dwellings and town homes. Every subterranean termite control contract for a control warranty only, without an initial treatment shall include:
(5) In addition to all other recordkeeping requirements, the licensee shall maintain reports of all monitoring, inspections and/or reinspections of the structure(s), baits or baiting systems and devices under contract. Such reports shall be provided to the property owner and a copy shall be maintained by the licensee for inspection by the enforcement agency, in a reasonable amount of time, for a period of two (2) years. The reports shall include the date of the monitoring, inspection or reinspection, name of the person performing the monitoring, inspection or reinspection and whether or not Wood Destroying Organisms or signs of termite activity were found.
(6) Copies of all contracts and supporting documentation (pesticide use records, diagrams of the structure and any Official Waiver Forms) shall be maintained by the licensee during the contract period and for a period of two (2) years following the date of expiration of the contract.
O.C.G.A. § 43-45-8.