Compilation of Rules and Regulations of the State of Georgia
Department 515 - RULES OF GEORGIA PUBLIC SERVICE COMMISSION
Chapter 515-9 - SAFE INSTALLATION AND OPERATION OF NATURAL GAS TRANSMISSION AND DISTRIBUTION SYSTEMS
Subject 515-9-8 - NATURAL GAS PIPELINE SAFETY AND PUBLIC AWARENESS PROGRAMS
Rule 515-9-8-.04 - Natural Gas Pipeline Safety and Public Awareness - Minimum Requirements

Current through Rules and Regulations filed through September 23, 2024

(1) The natural gas pipeline safety and public awareness messaging required by these Rules shall include, but not be limited to, the following types of information:

(a) the use of a one-call notification system prior to excavation and other damage prevention activities;

(b) the possible hazards associated with unintended releases from a gas pipeline facility;

(c) the physical indications that such a release may have occurred;

(d) the steps that should be taken for public safety in the event of a gas pipeline release;

(e) the procedures for reporting such an event; and

(f) the location of pipeline facilities.

(2) The Commission shall retain jurisdiction over any disputes between the EDC and a Marketer and/or Pooler as to the appropriate information to be included in all natural gas pipeline safety and public awareness mailings.

O.C.G.A. Secs. 46-2-20, 46-2-30, R. 515-9-1-.01.

Disclaimer: These regulations may not be the most recent version. Georgia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.