Rule 391-3-4-.11 - Closure Criteria

Current through Rules and Regulations filed through September 23, 2024

(1) 40 CFR Part 258, Subpart F, Section 258.60, as amended, 56 Fed. Reg. 51016, (October 9, 1991); 57 Fed. Reg. 28628 (June 26, 1992), as amended at 62 Fed. Reg. 40713 (July 29, 1997) is hereby incorporated by reference.

(2) This Rule shall be applicable to all solid waste handling facilities.

(3) A closure plan required by paragraph (1) of this Rule must be submitted as part of the application for a permit.

(4) Notice of final closure must be provided to the Director within 30 days of receiving the final load of waste. Any site not receiving waste for in excess of 180 days, unless otherwise approved by the Division, shall be deemed closed and in violation of these Rules unless properly closed. Notice of closure must include the date of final waste receipt and an accurate legal description of the boundaries of the landfill.

(5) All deeds for real property which have been used for landfilling shall include notice of the landfill operations, the date the landfill operation commenced and terminated, an accurate legal description of the actual location of the landfill, and a description of the type of solid wastes which have been deposited in the landfill. Concurrent with the submission of notice of final closure to the Director, the owner or operation must submit to the Director confirmation that the information required in this section has been noticed on the property deed.

(6) The owner or operator must close the solid waste disposal facility in accordance with a closure plan approved by the Division. Upon completing all requirements specified to close the facility outlined in the closure plan, the owner or operator must provide the Division with documentation signed by a registered professional engineer, registered in the state of Georgia, to certify that compliance with the closure requirements have been satisfied.

(7) The closure documentation as provided in paragraph (6) of this Rule must be completed on forms provided by the Division. If the documentation is accepted by the Division, the Director will issue the Post-Closure Permit and establish the beginning of the post-closure care period.

(8) Owners and operators of CCR units are exempt from this Rule and must meet the closure requirements in Rule 391-3-4-.10.

O.C.G.A. § 12-8-20 et seq., as amended.

Disclaimer: These regulations may not be the most recent version. Georgia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.