Section 2105-7.0 - Evaluation Budgeting and Budget Management
Universal Citation: 7 DE Admin Code 2105-7.0
Current through Register Vol. 28, No. 3, September 1, 2024
7.1 For any given program cycle, the EEAC will review evaluation budgets proposed by the PAs to ensure funding is at a level sufficient to cover EM&V.
7.2 The EEAC shall consider the following when approving the proposed EM&V Plans and when recommending EM&V activities:
7.2.1 Programs that are expected
to save more energy (in both the near-term and over their measure lifetimes) or
have high demand reduction impacts should have evaluation approaches that are
more rigorous than those that are expected to save less energy.
7.2.2 Programs that represent larger portions
of the portfolio budget should have a level of evaluation rigor that matches
the importance of the program's total financial investment.
7.2.3 Measures that have a high risk around
the accuracy of the savings should have a high level of evaluation rigor, thus
reducing the level of uncertainty around the energy saving estimates of that
program and for the portfolio.
7.2.4 Field measurement and verification
efforts should focus on the programs of the portfolio that have the greatest
risk of lowering the reliability of the total impact estimates.
7.2.5 Sampling approaches, sample-size
targets, and confidence limits should provide the highest level of accuracy
achievable balanced with the available resources. Large programs and programs
that are important for reaching energy saving targets should have sampling
approaches that reflect that importance. Low impact or smaller programs may
have lower precision and confidence levels.
7.2.6 Budgets devoted to process evaluations
should consider the likely opportunities to identify program improvements, the
current success of the program in terms of participation and overall program
implementation, and the likely duration of the program effort.
7.2.7 Where possible, evaluation activities
should support the ability of the PAs to meet the EM&V requirements for
participation in relevant and applicable energy and capacity markets, such as
the PJM RPM capacity market.
Disclaimer: These regulations may not be the most recent version. Delaware may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.