9.1 When an in-building system is installed, the building owner or their representative shall test all active components of the system, including, but not limited to, the amplifier, power supplies, and back-up batteries, a minimum of once every twelve (12) months. Annual testing will include:
9.2 Sampling Coverage Test - A transmit / receive coverage testing of 10% of the building grid will be required. Tests will be conducted in a different area of the building each year so that every 10 years the building has been completely tested. The testing area must be spread out throughout the building randomly. In that way, we are testing every amplifier in the system.
9.3 A copy of the test shall be retained on the inspected premises.
9.4 A copy of the test shall be sent to:
State of Delaware
Division of Communications
3050 Upper King Rd.
Dover, DE 19904