Connecticut Administrative Code
Title 19 - Public Health and Safety
13-B
Chapter II - ENVIRONMENTAL HEALTH
Mass Gatherings
Section 19-13-B83 - Prerequisite

Current through September 9, 2024

Water, toilet, handwashing and shower facilities shall be constructed and operational not later than seven days before the first day of the mass gathering. Plans necessary to show full compliance with the requirements of sections 19-13-B81 to 19-13-B96 shall be submitted to the local director of health 30 days in advance of such assembly. The plans shall provide for adequate and satisfactory water supply and sewage facilities, adequate drainage, adequate toilet, handwashing and shower facilities, adequate sleeping areas and facilities, adequate facilities for proper food storage, preparation and service, insect and noxious weed control, adequate refuse storage, collection and disposal facilities, adequate first aid, nursing and medical facilities, and such other matters as may be appropriate for security of life or health.

Disclaimer: These regulations may not be the most recent version. Connecticut may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.