Connecticut Administrative Code
Title 13b - Transportation
17 - Encroachment Permit Regulations
Section 13b-17-26 - Responsibility for boundary lines

Current through September 9, 2024

Permit applicants may retain their own licensed land surveyors to determine the existing line and must inform themselves of the demarcation between the public domain and private holdings. When a portion of a developer's frontage is to be deeded to the State, and included as part of the highway right of way, the developer shall perform the necessary field survey work and prepare the deed for signature and filing. The costs incurred by the Department to bound the new or existing right of way lines and preparation of related plans and documents will be borne by the permittee.

Disclaimer: These regulations may not be the most recent version. Connecticut may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.