- Section 13b-17-1 - Purpose and applicability
- Section 13b-17-2 - Definitions
- Section 13b-17-3 - Conditions for issuance of permits
- Section 13b-17-4 - Application for permit
- Section 13b-17-5 - Rejection of applications
- Section 13b-17-6 - Inviolability of non-access lines
- Section 13b-17-7 - Issuance of permit
- Section 13b-17-8 - Bond requirements
- Section 13b-17-9 - Insurance requirements
- Section 13b-17-10 - Obligation of the permittee and the state
- Section 13b-17-11 - Cost of permit work
- Section 13b-17-12 - Removal of material from highway right of way
- Section 13b-17-13 - Drainage requirements
- Section 13b-17-14 - Construction of roads and streets
- Section 13b-17-15 - Driveways
- Section 13b-17-16 - Major traffic generators
- Section 13b-17-17 - Utility installation requirements
- Section 13b-17-18 - Parking areas within the highway right of way
- Section 13b-17-19 - Signs
- Section 13b-17-20 - Mailboxes
- Section 13b-17-21 - Gasoline stations
- Section 13b-17-22 - Parades, block dances, etc
- Section 13b-17-23 - Holidays
- Section 13b-17-24 - Emergency permits
- Section 13b-17-25 - Extension of time
- Section 13b-17-26 - Responsibility for boundary lines
- Section 13b-17-27 - Construction or repair of sidewalks, curbs or steps
- Section 13b-17-28 - Safety to traffic
- Section 13b-17-29 - Removal of existing pavement surfaces
- Section 13b-17-30 - Excavating and trenching
- Section 13b-17-31 - Trench support
- Section 13b-17-32 - Slide and cave-ins
- Section 13b-17-33 - Jacking, boring or tunnelling
- Section 13b-17-34 - Blasting
- Section 13b-17-35 - Backfilling
- Section 13b-17-36 - Temporary pavement repairs and improved shoulder repairs
- Section 13b-17-37 - Period of settling
- Section 13b-17-38 - Making repairs on roadsides
- Section 13b-17-39 - Responsibility for replacement of pavement, shoulders and other parts of the highway
- Section 13b-17-40 - Quality of construction and repair work
- Section 13b-17-41 - Final inspection, acceptance of work and closing out of permits
- Section 13b-17-42 - Refusal to do acceptable work
- Section 13b-17-43 - Revoking permits
- Section 13b-17-44 - Keeping drainage system open
- Section 13b-17-45 - Protecting tree roots
- Section 13b-17-46 - Detours
- Section 13b-17-47 - Repealed
- Section 13b-17-48 to 13b-17-99 - Reserved
- Rail Regulatory Activities Initiated Pursuant to Chapters 278, 279 and 280 of the Connecticut General Statutes
- Rules of Practice
Disclaimer: These regulations may not be the most recent version. Connecticut may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.