6.1. Public Warehouse Operations. The public warehouse must ensure the facility conditions and equipment are suitable for the storing and shipping of commodities and must ensure:
6.2. Facility Requirements. A public warehouse must comply with the following:
6.3. Storage Capacity. Approved storage space may be used only when all other licensing requirements have been met, and a public warehouse license has been issued by the Commissioner.
6.4. Emergency and Temporary Storage. The public warehouse operator may, under the Commissioner's sole discretion, license emergency or temporary storage space for commodities. The requirements for flooring, sidewalls, and immobility in Part 3.3.6 may be modified by the Commissioner for emergency or temporary storage on a case-by-case basis. Any request for such exemption must demonstrate adequate protection for any stored commodity.
* Submit a written request to the Department for the use of the emergency or temporary storage, including the location and the total bushel amount to be stored;
* Operate the emergency and temporary storage space in conjunction with the licensed warehouse;
* Meet all bonding, net worth, financial assurance and insurance requirements;
* Provide access to the emergency and temporary storage space for examination purposes;
* Maintain separate inventory records of each commodity stored in emergency and temporary storage space, as well as accounting for such commodities in the Daily Position Report; and
* Provide notification to the Department of the date when all the commodities stored in temporary and emergency space have been removed.
* Use asphalt, concrete or other approved base materials;
* Use rigid self-supporting sidewalls;
* Provide adequate aeration;
* Provide acceptable covering or tarp;
* Provide written notification before reusing licensed temporary space for another crop year; and
* Pick up all grain in temporary storage by July 1. Additional time to pick up grain may be requested so long as the grain is in adequate condition.