Code of Colorado Regulations
1000 - Department of Public Health and Environment
1007 - Hazardous Materials and Waste Management Division
6 CCR 1007-3 - HAZARDOUS WASTE
Part 262 - HAZARDOUS WASTE - STANDARDS APPLICABLE TO GENERATORS OF HAZARDOUS WASTE
Subpart B - Manifest Requirements Applicable to Small and Large Quantity Generators
Section 6 CCR 1007-3-262.20 - General Requirements

Current through Register Vol. 47, No. 17, September 10, 2024

(a)

(1) A generator that transports, or offers for transport a hazardous waste for offsite treatment, storage, or disposal, or a treatment, storage, or disposal facility that offers for transport a rejected hazardous waste load, must prepare a Manifest (OMB Control number 2050-0039) on EPA form 8700-22 and, if necessary, EPA form 8700-22A.

(2) The revised manifest form and procedures in §§ 260.10, 261.7, 262.20, 262.21, 262.27, 262.32, 262.34, 262.54, and 262.60, shall not apply until September 5, 2006. The manifest form and procedures contained in §§ 260.10, 261.7, 262.20, 262.21, 262.32, 262.34, 262.54, and 262.60, of these regulations at the time of the May 2006 rulemaking hearing shall be applicable until September 5, 2006.

(3) Electronic manifest. In lieu of using the manifest form specified in paragraph (a)(1) of this section, a person required to prepare a manifest under paragraph (a)(1) of this section may prepare and use an electronic manifest, provided that the person:
(i) Complies with the requirements in § 262.24 for use of electronic manifests, and

(ii) Complies with the requirements of 40 CFR § 3.10 for the reporting of electronic documents to EPA.

(b) A generator must designate on the manifest one facility which is permitted to handle the waste described on the manifest.

(c) A generator may also designate on the manifest one alternate facility which is permitted to handle his/her waste in the event an emergency prevents delivery of the waste to the primary designated facility.

(d) If the transporter is unable to deliver the hazardous waste to the designated facility or the alternate facility, the generator must either designate another facility or instruct the transporter to return the waste.

(e) The requirements of this Subpart B do not apply to hazardous waste produced by generators of greater than 100 kg but less than 1000 kg in a calendar month where:

(1) The waste is reclaimed under a contractual agreement pursuant to which:
(i) The type of waste and frequency of shipments are specified in the agreement;

(ii) The vehicle used to transport the waste to the recycling facility and to deliver regenerated material back to the generator is owned and operated by the reclaimer of the waste; and

(2) The generator maintains a copy of the reclamation agreement in his/her files for a period for at least three years after termination or expiration of the agreement.

(f) The requirements of this subpart and § 262.32(b) do not apply to the transport of hazardous wastes on a public or private right-of-way within or along the border of contiguous property under the control of the same person, even if such contiguous property is divided by a public or private right-of-way. Notwithstanding § 263.10(a), the generator or transporter must comply with the requirements for transporters set forth in §§ 263.30 and 263.31 of these regulations in the event of a discharge of hazardous waste on a public or private right-of-way.

Disclaimer: These regulations may not be the most recent version. Colorado may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.