Code of Colorado Regulations
1000 - Department of Public Health and Environment
1002 - Water Quality Control Commission (1002 Series)
5 CCR 1002-63 - REGULATION NO. 63 - PRETREATMENT REGULATIONS
Section 5 CCR 1002-63.12 - NATIONAL CATEGORICAL PRETREATMENT STANDARDS: GENERAL REQUIREMENTS
Current through Register Vol. 47, No. 17, September 10, 2024
Categorical standards specifying quantities or concentrations of pollutants or pollutant properties which may be discharged to a POTW by existing or new Industrial Users in specific industrial subcategories have been established by EPA and are hereby incorporated by reference in this regulation, in accordance with the provisions of section 63.5 . The specific limits for each subcategory must be met by all significant industrial users that fall within the industrial categories set forth in Table I of these regulations. Unless otherwise specified Categorical Pretreatment Standards shall be in addition to all applicable pretreatment standards and requirements set forth in this regulation. Failure to meet the limitations established is a violation of this regulation and will result in the necessary enforcement action.
Table 1 - Effluent Guidelines and Standards |
|
40 CFR 405 |
Dairy Products Processing |
40 CFR 406 |
Grain Mills Point |
40 CFR 407 |
Canned and Preserved Fruits and Vegetables Processing |
40 CFR 408 |
Canned and Preserved Seafood Processing |
40 CFR 409 |
Sugar Processing |
40 CFR 410 |
Textile Mills |
40 CFR 411 |
Cement Manufacturing |
40 CFR 412 |
Concentrated Animal Feeding Operations (CAFO) |
40 CFR 413 |
Electroplating |
40 CFR 414 |
Organic Chemicals, Plastics, and Synthetic Fibers |
40 CFR 415 |
Inorganic Chemicals Manufacturing |
40 CFR 417 |
Soap and Detergent Manufacturing |
40 CFR 418 |
Fertilizer Manufacturing |
40 CFR 419 |
Petroleum Refining |
40 CFR 420 |
Iron and Steel Manufacturing |
40 CFR 421 |
Nonferrous Metals Manufacturing |
40 CFR 422 |
Phosphate Manufacturing |
40 CFR 423 |
Steam Electric Power Generating |
40 CFR 424 |
Ferroalloy Manufacturing |
40 CFR 425 |
Leather Tanning and Finishing |
40 CFR 426 |
Glass Manufacturing |
40 CFR 427 |
Asbestos Manufacturing |
40 CFR 428 |
Rubber Manufacturing |
40 CFR 429 |
Timber Products Processing |
40 CFR 430 |
The Pulp, Paper, and Paperboard |
40 CFR 432 |
Meat Products |
40 CFR 433 |
Metal Finishing |
40 CFR 434 |
Coal Mining |
40 CFR 435 |
Oil and Gas Extraction |
40 CFR 436 |
Mineral Mining and Processing |
40 CFR 437 |
Centralized Waste Treatment |
40 CFR 439 |
Pharmaceutical Manufacturing |
40 CFR 440 |
Ore Mining and Dressing |
40 CFR 442 |
Transportation Equipment Cleaning |
40 CFR 443 |
Paving and Roofing Materials (Tars and Asphalt) |
40 CFR 444 |
Waste Combustors |
40 CFR 445 |
Landfills |
40 CFR 446 |
Paint Formulating |
40 CFR 447 |
Ink Formulating |
40 CFR 454 |
Gum and Wood Chemicals Manufacturing |
40 CFR 455 |
Pesticide Chemicals |
40 CFR 457 |
Explosives Manufacturing |
40 CFR 458 |
Carbon Black Manufacturing |
40 CFR 459 |
Photographic |
40 CFR 460 |
Hospital |
40 CFR 461 |
Battery Manufacturing |
40 CFR 463 |
Plastics Molding and Forming |
40 CFR 464 |
Metal Molding and Casting |
40 CFR 465 |
Coil Coating |
40 CFR 466 |
Porcelain Enameling |
40 CFR 467 |
Aluminum Forming |
40 CFR 468 |
Copper Forming |
40 CFR 469 |
Electrical and Electronic Components |
40 CFR 471 |
Nonferrous Metals Forming and Metal Powders |
This section incorporates 40 CFR 403.8 by reference. This is from the Code of Federal Regulations as of December 12, 2016, and does not include later amendments to, or editions of the incorporated material.
A. Significant Industrial Users in Non-Approved Programs - Procedure for Implementation of Pretreatment Standards and Requirements Pretreatment Standards and Requirements shall be implemented for those Significant Industrial Users as defined at 63.7 for which the Director is the Control Authority.
B. Procedure for Implementation of the Categorical Pretreatment Standards
The following implementation procedure is to be followed for those Industrial Users subject to categorical discharge requirements for which the Director is the Control Authority. Industrial Users discharging to POTW's with approved programs are to follow those procedures established by the POTW.
The Director may request additional information if needed to support the statements above.
Failure of the Director to include a requirement of the regulations in the letter does not constitute a waiver of the requirement. The Industrial User will be expected to comply with all applicable portions of the regulations.