Current through Register Vol. 47, No. 17, September 10, 2024
A. Tanks
and Vaults
1. Watertightness
a. Septic tanks, vaults, dosing tanks, other
treatment components, risers and lids must not allow infiltration of ground
water or surface water and must not allow the release of wastewater or liquids
through other than designed openings.
b. When the final compartment of a tank is
being proposed for use as a pump or siphon chamber, the wall between this
chamber and the previous chamber must be watertight except for the intended
hydraulic opening.
c. Acceptable
watertightness testing methods performed at a manufacturer's site or in the
field include water filling the tank or vacuum testing.
2. Tank Anchoring: In locations where ground
water or floodwaters may cause instability problems to the septic tank, vault,
or other treatment unit in the OWTS due to flotation, the tank, vault or unit
must be anchored in a manner sufficient to provide stability when the tank is
empty. Risers must be included in the buoyancy calculations.
a. If a manufacturer provides recommendations
for anchoring designs, they may be used if they meet the conditions present at
the site.
b. If a manufacturer does
not provide recommendations for provisions to compensate for buoyancy, or if
the professional engineer chooses to provide his/her own designs, the anchoring
system design must be prepared by the professional engineer.
3. Identification and Data
Marking: All tanks and treatment units must be permanently and legibly marked
in a location for the purpose of inspection that is readily visible when
inspected before backfilling. The marking inscription must include the
following:
a. Name of manufacturer;
b. Model or serial number, if
available;
c. Effective volume and
unit of measure;
d. Maximum depth
of earth cover and external loads the tanks is designed to resist;
and
e. Inlet and outlet
identifications, if relevant.
B. Septic Tanks
1. The manufacturer must provide sufficient
information to demonstrate that the tank will meet the design
specification.
2. Sizing
Requirements:
a. Sizing for residential
capacity for new installations must be based upon the number of bedrooms
according to Table 9-1:
Table 9-1 Minimum Septic Tank Size Based on Number of
Bedrooms
Number of Bedrooms
|
Tank Capacity (gallons)
|
2 or 3
|
1,000
|
4
|
1,250
|
Each Additional
|
250
|
b.
For multi-family and non-residential applications, a septic tank must be sized
to permit detention of incoming wastewater design flows for a minimum of 48
hours.
c. For systems that remove
toilet waste for separate treatment, tank capacity may be less than 1,000
gallons, if it provides a minimum of 48 hours detention time.
d. Minimum tank size for new installations
other than for a single-family residence is 400 gallons.
3. Inspection and Testing of Septic Tank
Watertightness
a. Testing of septic tanks
must be performed and evaluated as specified in section 9 of ASTM C1227-13
(Standard Specification for Precast Septic Tanks) (2013 version) for concrete
tanks or in Standard IAPMO/ANSI Z1000-2013 (American Standards for
Prefabricated Septic Tanks) (2013 version) for other prefabricated septic
tanks.
b. Each unit must be
inspected in the field for conditions that may compromise its
watertightness.
c. The inspection
in the field must be conducted by the local public health agency and be
performed after the tank installation but before backfilling.
d. If the inspection in the field indicates
that the tank may be damaged or is not watertight, the inspector may require
that the tank be tested for watertightness by the tank manufacturer or the
system contractor.
4.
Septic Tank Design and Dimension Criteria
a. A
septic tank must have two or more compartments or more than one tank may be
used in series. The first compartment of a two-compartment tank or the first
tank in a series must hold no less than one-half of the required effective
volume.
b. Inlet invert must be at
least two inches higher than the outlet invert.
c. Inlet tee or baffle must extend above the
surface of the liquid at least five inches and must extend a minimum of eight
inches below the liquid surface. However the inlet tee or baffle must not
extend to a depth of more than 40 percent of the liquid depth measured from the
liquid surface.
d. Outlet tee or
baffle must extend at least 5 inches above and 14 inches below the outlet
invert, however it must not extend to more than 40 percent of the liquid depth
measured from the liquid surface. The outlet tee or baffle that accommodates an
effluent screen must be located so that the effluent screen has sufficient
clearance to be removed through the access opening with a riser in
place.
e. The distance from the
outlet invert to the underside of the tank top must be at least ten
inches.
f. Liquid depth must be a
minimum of 30 inches and the maximum depth must not exceed the tank
length.
g. The transfer of liquid
from the first compartment to the second or successive compartment must be made
at a liquid depth of between 35 and 40 percent of the liquid depth measured
from the liquid surface.
h. At
least one access opening no less than 20 inches across must be provided in each
compartment of a septic tank.
i. A
septic tank must have a minimum of 25 square feet of liquid surface area and
have at least a six-foot separation between inlets and outlets. Septic tanks in
series, combined, must have a minimum of 25 square feet of liquid surface area
and the sum of the distances between inlets and outlets of all tanks must be at
least six feet. The requirements for liquid surface area and separation between
inlet and outlet may be waived for tanks with less than 750 gallon effective
volume.
5. Concrete
Septic Tank Structural Design
a. Concrete
septic tanks must comply with the structural design criteria of ASTM C1227-13
(2013 version) (Standard Specification for Precast Septic Tanks).
b. The design for each tank model and size by
each manufacturer must be certified by a professional engineer as complying
with these design and structural requirements and the watertightness standard
of this regulation.
c.
Certification by a professional engineer must be submitted to the Division for
acceptance.
d. Tank slab lids,
mid-seam tanks, and the connections between the tank and risers must be
designed to provide for a watertight seal.
6. Fiberglass, Fiberglass-Reinforced
Polyester, and Plastic Tanks
a. All
fiberglass, fiberglass-reinforced polyester, and plastic tanks must meet the
minimum design and structural criteria of IAPMO/ANSI Z1000-2013 (2013 version)
(American Standards for Prefabricated Septic Tanks) and be certified by a
professional engineer as meeting these standards. The professional engineer
certifying the criteria must be registered or licensed in the United States,
but need not be registered in Colorado.
b. All tanks must be sold and delivered by
the manufacturer or manufacturer's designated representative, preferably
completely assembled. On-site tank assembly will be allowed on an as-needed
basis.
c. Tanks must be
structurally sound and support external forces as specified in the standard
referenced above when empty and internal forces when full. Tanks must not
deform or creep resulting in deflection of more than five percent in shape as a
result of loads imposed.
d. All
tanks must be constructed of sound, durable materials and not be subject to
excessive corrosion, decay, frost damage, or cracking.
e. All seams or connections including to
risers must be sealed to be watertight.
7. Metal tanks are prohibited.
C. Abandonment of Tank
1. A tank may be completely removed and the
parts disposed of safely.
2. If the
tank will remain in place:
a. The tank must
be pumped to remove as much waste as possible;
b. The bottom of the tank must be broken so
the tank neither floats nor fills with water;
c. The top must be collapsed and the sides
may be broken into the void;
d. The
remaining void must be filled with gravel, sand or compacted soil;
and
e. The filled excavation will be
graded to surroundings, allowing for settling.
3. The local public health agency may require
abandonment of a tank that is deemed to be a hazard.
D. Pipe Standards and Bedding Requirements:
1. Pipe Standards
a. All wastewater pipes used in portions of
an OWTS that are pressurized must be constructed of compatible pipe, primer,
bonding agent, and fittings. Flexible couplings to connect pipes may only be
used in portions of an OWTS that are intended for gravity flow of the
wastewater.
b. Where unperforated
plastic pipe and fittings are used for gravity flow, the minimum wall thickness
of the pipe must conform to ASTM Standard D 3034-16 (2016 version) or
equivalent or greater strength. Schedule 40 pipe is preferred.
c. Perforated distribution pipe surrounded by
rock within a soil treatment area must have a minimum wall thickness and
perforations conforming to ASTM Standard D 2729-17 (2017 version) or equivalent
or greater strength. Corrugated polyethylene pipe with smooth interior that
meets ASTM F405-13 (2013 version) or AASHTO M252-09 (2009 version)
specifications or equivalent may be used.
d. Schedule 40 [ASTM Standard D 3034-16 (2016
version)] or pipe of equivalent or greater strength must be used for the
placement of piping under driveways or roadways and in instances where sewer
line setback distances are granted a variance for any reason.
e. Tile pipe, open-joint pipe, and cast iron
pipe must not be used in an OWTS.
f. Pressure pipe must be rated for the
intended use to accommodate pump discharge pressure.
2. Bedding: All system piping, except for
distribution laterals within the soil treatment area, must be bedded with
select material before final inspection by the local public health agency.
Select bedding material must consist of loose, granular material, free from
stones, clods, frozen soil, or other deleterious material. Select material may
consist of on-site job-excavated or imported material. Bedding material must be
mechanically compacted to support piping.
E. Cleanouts required between the building
and the septic tank:
1. Cleanouts must have a
secure cap and a riser extending to or easily accessible from grade. The
installation of a straight tee or sanitary tee is acceptable.
2. Cleanouts must be provided within five (5)
feet of the outside of the building.
3. Where a sewer has a change of horizontal
direction greater than 45 degrees, a cleanout must be installed at the change
of direction unless a cleanout already exists within 40 feet upstream of this
fitting. Where more than one change of direction greater than 45 degrees occurs
within 40 feet of a developed length of piping, the cleanout for the first
change of direction may serve as the cleanout for all changes within that 40
feet of developed length of pipe.
4. Cleanouts must be provided at intervals
within the building sewer from the structure to the tank of not more than 100
feet. The effluent pipe between the septic tank and soil treatment area is
exempt from this requirement
F. Distribution Box: A distribution box, if
used, must be of sufficient size to distribute effluent equally to the laterals
of a trench or absorption bed system. The box must be constructed with the
inlet invert at least one inch above the level of the outlet inverts. Flow
equalizers or similar devices must be used to adjust the flow between laterals.
Access to the box must be provided with a manhole riser with access lid at or
above grade if the top of the box does not reach final grade.
G. Drop Box: In sequential or serial
distribution, a watertight box may be used to transfer the effluent to the
following trench when the effluent in a trench has received the designed level
for overflow to the next trench. A drop box shall have a riser at or above
final grade, if the top of the drop box does not reach final grade. Outlet
pipes in sequential distribution must be designed and installed so that they
may be capped off for resting periods.
H. Stepdown/Relief Pipe: In sequential or
serial distribution, an unperforated pipe may be used to transfer the effluent
to the following trench when the effluent in a trench has received the designed
level for overflow from that trench.
I. Wastewater Pumping and Dosing Siphon
Systems
1. Pumps
a. Non-clog pump opening must have at least
two-inch diameter solids handling capacity where raw wastewater is pumped. A
pump opening must not have more than 3/4-inch diameter solids handling capacity
if previously settled effluent is pumped.
b. Pumps must be certified to the UL778
(Edition 6 or earlier version) electrical safety standard, bear the seal of
approval of CSA, UL or an equivalent testing program, and be constructed of
corrosion resistant materials.
c.
Grinder pumps must also be certified to NSF/ANSI Standard 46 (2017 or earlier
version) and bear the seal of approval of the NSF or equivalent testing and
certification program.
2. Floats and Switches
a. Automatic liquid level controls must be
provided to start and shut off pumps at a frequency or level specified in the
design.
b. Floats must be mounted
on a stem separate from the pump discharge piping to allow for removal,
adjustment, and replacement of the float from grade without removing the
pump.
c. Float switches must be
certified to the UL
60947-4-1 (Edition 3 or earlier
version), or CSA C22.2 No. 205-17 (2017 or earlier version) electrical safety
standards, bear the seal of approval of CSA, UL or an equivalent certification
program, and be constructed of corrosion resistant materials.
d. Dosing siphons for pressure dosing and
higher level treatment systems must provide for a means of determining the
number of dosing events.
3. Location of Pump or Siphon
a. A pump or a siphon may be installed in a
separate tank following the septic tank. The tank must be of sufficient volume
to allow pump or siphon cycling commensurate with the design
capacity.
b. The second compartment
of a two-compartment septic tank may only be used as the pump tank when the
tank is specifically designed for this purpose and it can be demonstrated to
the satisfaction of the local public health agency that the minimum 48-hour
detention time will not be decreased. The pump must be screened or provided
with an approved filtering device to assure that only liquid effluent will be
discharged. The transfer of liquid from the first to the second compartment
must be at an elevation that is between the inlet and outlet invert elevations,
and through a standard tee designed and located as per the requirements of
section 43.9.B.4 .d. Siphons must not be installed in the second compartment of
a two compartment tank.
c. The use
of a three-compartment septic tank, sized to provide the required effective
volume in the first two compartments with the pump or siphon in the third
compartment is acceptable for tanks specifically designed for this purpose. The
transfer of liquid from the second to the third compartment must be at an
elevation that is between the inlet and outlet invert elevation, and through a
standard tee designed and located as per the requirements of section
43.9.B.4.d.
4. Pump or
Siphon Discharge Piping
a. The discharge pipe
from the pumping or siphon chamber must be protected from freezing by burying
the pipe below frost level or sloping the pipe to allow it to be self-draining.
Drainage must be provided through the bottom of the pump or through a weep hole
located in the discharge pipe prior to exiting the tank.
b. The pump discharge piping must have a
quick disconnect that is accessible from grade to allow for easy pump access
and removal.
c. The pipe must be
sized to maintain a velocity of two or more feet per second.
d. Pressure pipes must be designed to prevent
air or vacuum locking and allow self draining of the pipes.
5. Access
a. The pump or dosing system tank, chamber,
or compartment must have a minimum 24-inch diameter access riser, made of
corrosion-resistant material, extending to or above ground level. A smaller
diameter riser may only be installed if it is accepted by the Division as an
integral component of a specific product during the product review
process.
b. The access riser must
have a watertight connection to the pump or dosing chamber/compartment to
prevent infiltration or exfiltration. All other intrusions to the riser for
electrical or other component access must also be watertight.
6. Splice Box
a. Splice boxes must be located outside the
pump system access riser and be accessible from the ground surface.
b. Wire splices are prohibited inside the
tank, dosing chamber or riser. Wire splicing must be completed with
corrosion-resistant, watertight connectors.
7. Controls
a. Control panels or other electrical boxes
used to control the functions of an OWTS must comply with the following, as
appropriate:
(1) The pump system must have an
audible and visual alarm notification in the event an excessively high water
condition occurs.
(2) The pump must
be connected to a circuit breaker separate from the alarm breaker and from any
other control system circuits.
(3)
An electrical disconnect must be provided within the line of sight of the pump
chamber.
(4) The pump system must
be provided with a means that will allow the pump to be manually operated; such
as an H.O.A. switch (Hand/Off/Auto).
(5) The pump system for pressure dosing and
higher level treatment systems must have a mechanism for tracking both the
amount of time the pump runs and the number of cycles the pump
operates.
(6) Must bear the seal
indicating acceptable product testing from a U.S. Department of Labor,
Occupational Safety and Health Administration Nationally Recognized Testing
Laboratory (NRTL) (
https://www.osha.gov/dts/otpca/nrtl/nrtllist.html),
such as UL or ETL.
J. Effluent Screens
1. A local public health agency may require
that effluent screens be installed in all septic tanks in new installations and
repairs where the septic tank is replaced.
2. If a pump or dosing siphon is used to
remove septic tank effluent from the final compartment of the septic tank, the
effluent must be filtered prior to dispersal into the soil treatment area. An
effluent screen, pump vault equipped with a filter cartridge, or a filter on
the discharge pipe, would all be considered acceptable.
3. The effluent screen must be cleaned at
manufacturer-recommended intervals, or more often, if use patterns
indicate.
4. An alarm may be
installed on an effluent screen indicating need for maintenance. A local public
health agency may require all effluent screens to be equipped with
alarms.
5. Where an ejector pump,
grinder pump or non-clog pump is proposed for use prior to the septic tank, an
effluent screen must be installed on the outlet of the septic tank.
6. The handle of the effluent screen must
extend to within 12 inches of grade.
K. Grease Interceptor Tanks
1. All commercial food service facilities and
other facilities generating fats, oils and greases in their waste must install
a grease interceptor tank.
2.
Grease interceptor tanks shall treat only those portions of the total
wastewater flow in which grease and oils are generated.
3. The grease interceptor must have a minimum
of two compartments and must be sized proportionate to the amount of fats, oils
and grease it receives, the peak flow rate through the tank, and the expected
cleaning frequency.
4. The inlet
and outlet tees or baffles must extend into the bottom 1/3 of the liquid
volume, but must be at least 12 inches off the inside floor of the
interceptor.
5. The inlet and
outlet tees or baffles must extend at least 5 inches above the liquid level and
must provide for a free vent area across the liquid surface.