California Code of Regulations
Title 8 - Industrial Relations
Division 1 - Department of Industrial Relations
Chapter 4 - Division of Industrial Safety
Subchapter 7 - General Industry Safety Orders
Group 13 - Cranes and Other Hoisting Equipment
Article 96 - Tower Cranes
Section 4968.2 - Operational AIDS
Current through Register 2024 Notice Reg. No. 38, September 20, 2024
(a) Section 5018 does not apply to tower cranes.
(b) The devices listed in this section ("operational aids") are required on all tower cranes covered by Group 13, unless otherwise specified.
(c) Operations shall not begin unless the operational aids are in proper working order. If a listed operational aid stops working properly during operations, the operator shall safely stop operations until the device is repaired, or the device is again working properly.
(d) Operational aids and alternative measures. Operational aids listed in this section that are not working properly shall be repaired no later than 7 calendar days after the deficiency occurs subject to the provisions of subsection (c).
Temporary alternative measure: Mark the cable (so it can be seen by the operator) at a point that will give the operator sufficient time to stop the hoist prior to the last 2 wraps of hoist cable being spooled off the drum.
Temporary alternative measures: Use of wind speed information from a properly functioning indicating device on another tower crane on the same site, or a qualified person estimates the wind speed.
1. New section filed 7-26-2022; operative 7-26-2022 pursuant to Government Code section 11343.4(b)(3) (Register 2022, No. 30). Filing deadline specified in Government Code section 11349.3(a) extended 60 calendar days pursuant to Executive Order N-40-20 and an additional 60 calendar days pursuant to Executive Order N-71-20.
Note: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code.