California Code of Regulations
Title 8 - Industrial Relations
Division 1 - Department of Industrial Relations
Chapter 4 - Division of Industrial Safety
Subchapter 7 - General Industry Safety Orders
Group 13 - Cranes and Other Hoisting Equipment
Article 100 - Inspection and Maintenance
Section 5031.1 - Inspection - Post-Assembly
Upon completion of assembly, and before use, the crane shall be inspected by a qualified person to assure that it is configured in accordance with the manufacturer's criteria.
NOTE: Disassembly and reassembly of equipment does not require recertification of the equipment provided that the equipment is reassembled and used in a manner consistent with its certification.
1. New section filed 7-26-2022; operative 7-26-2022 pursuant to Government Code section 11343.4(b)(3) (Register 2022, No. 30). Filing deadline specified in Government Code section 11349.3(a) extended 60 calendar days pursuant to Executive Order N-40-20 and an additional 60 calendar days pursuant to Executive Order N-71-20.
Note: Authority cited: Section 142.3, Labor Code. Reference: Section 142.3, Labor Code.