California Code of Regulations
Title 8 - Industrial Relations
Division 1 - Department of Industrial Relations
Chapter 4 - Division of Industrial Safety
Subchapter 6 - Elevator Safety Orders
Group IV - Conveyance Installations for Which the Installation Contract Was Signed on or After May 1, 2008
Article 41 - Conveyances Covered by ASME A17.1-2004
Section 3141.3 - Static Controls

Universal Citation: 8 CA Code of Regs 3141.3

Current through Register 2024 Notice Reg. No. 38, September 20, 2024

(a) The installation of static controls shall comply with the requirements of ASME A17.1-2004 applicable to the conveyance involved.

(b) The Certified Qualified Conveyance Company (CQCC) installing static controls shall provide the Division with verification that the control complies with the requirements of ASME A17.1-2004. This information shall be in the form of:

(1) Electrical schematic diagrams or block diagrams of the control and safety circuits; and

(2) A written check-off procedure and demonstration of safety and speed control circuits at the time of the initial inspection.

(c) The results of the Electromagnetic Interference (EMI) testing required by ASME A17.1-2004 shall be submitted to the Division for review. The test shall include any wireless communication system used.

1. New section filed 4-1-2008; operative 5-1-2008 (Register 2008, No. 14).

Note: Authority cited: Sections 142.3 and 7323, Labor Code. Reference: Sections 142.3 and 7323, Labor Code.

Disclaimer: These regulations may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.