California Code of Regulations
Title 3 - Food and Agriculture
Division 4 - Plant Industry
Chapter 3 - Entomology and Plant Quarantine
Subchapter 4 - Plant Quarantine
Article 4 - Interior Quarantine (Regulations)
Section 3423 - Oriental Fruit Fly Interior Quarantine (Quarantine Regulation 28)
Current through Register 2024 Notice Reg. No. 12, March 22, 2024
A quarantine is established against the following pest, its hosts, and possible carriers.
(a) Pest. Oriental fruit fly (Bactrocera dorsalis).
(b) Area Under Quarantine.
(c) Articles and Commodities Covered. The following are declared to be hosts and possible carriers of Oriental fruit fly.
Akia | Wikstroemia phyllyraefolia | |
Alexander laurel, laurel | Calophyllum inophyllum | |
Apple, common | Malus sylvestris | |
Apricot | Prunus armeniaca | |
Avocado | Persea americana | |
Banana | Musa paradisica var. sapientum = (Musa x paradisiaca) | |
Banana, dwarf | Musa nana | |
Barbados cherry | Malphighia glabra | |
Brazil cherry | Eugenia dombeyi | |
Breadfruit | Artocarpus altilis | |
Cactus | Cereus coerulescens | |
Caimitillo | Chrysophyllum oliviforme | |
Cashew | Anacardium occidentale | |
Cherimoya | Anonna cherimola | |
Cherry, Catalina | Prunus ilicifolia (ornamental) | |
Cherry, Portugese | Prunus lusitanica | |
Cherry, Sweet | Prunus avium | |
Chili | Capsicum frutescens var. longum | |
Coffee, Arabian | Coffea arabica | |
Country gooseberry | Averrhoa carambola | |
Cucumber | Cucumis sativas | |
Custard apple | Annona squamosa | |
Custard apple, Annona | Annona reticulata | |
Date palm | Phoenix dactylifera | |
Dragon tree | Dracena draco | |
Eggfruit tree | Pouteria campechiana = (Lucuma nervosa) | |
Elengi tree | Mimusops elengi | |
Fig, common | Ficus carica | |
Gourka | Garcinia celebica | |
Granadilla, Purple Passionflower | Passiflora edu | |
Granadilla, sweet | Passiflora ligularis | |
Granadilla, yellow | Passiflora lauriflora | |
Grape | Vitis spp. | |
Grapefruit | Citrus paradisi | |
Guava | Psidium guajava | |
Guava, pineapple | Feijoa sellowiana | |
Guava, red strawberry | Psidium littorale | |
Guava, yellow strawberry | Psidium cattleianum lucidum | |
Imbu | Spondias tuberosa | |
Jackfruit | Artocarpus heterophyllus | |
Jerusalem Cherry | Solanum pseudocapiscum | |
Jharber | Ziziphus nummularia, = Ziziphus rotundifolia | |
Jujube, Common | Ziziphus zizyphus, = Ziziphus jujuba | |
Jujube, Indian | Ziziphus mauritiana | |
Jujube, Jackal | Ziziphus oenoplia | |
Kitembilla | Dovyalis hebecarpa | |
Kumquat | Fortunella japonica | |
Lemon | Citrus limon | |
Lime, Persian | Citrus latifolia | |
Lime, sour | Citrus aurantiifolia | |
Longan | Euphoria longan | |
Loquat | Eriobotrya japonica | |
Lychee | Lychee chinensis | |
Malay apple | Eugenia malaccensis | |
Mammee apple | Mammea americana | |
Mandarin (tangerine) | Citrus reticulata | |
Mango | Mangifera indica | |
Mangosteen | Garcinia mangostana | |
Mock orange | Murraya exotica | |
Mulberry, black | Morus nigra | |
Myrtle, downy rose | Rhodomyrtus tomentosa | |
Natal plum | Carissa grandiflora | |
Nectarine | Prunus persica var. nectarina | |
Oleander, yellow | Thevetia peruviana | |
Orange, calamondin | Citrus japonica and Citrus mitis | |
Orange, Chinese | Citrus japonica hazara | |
Orange, king | Citrus, nobilis | |
Orange, sour | Citrus aurantium | |
Orange, sweet | Citrus sinensis | |
Orange, unshu | Citrus unshu | |
Otaheite apple | Spondias dulcis | |
Palm, date | Phoenix spp. | |
Palm, syrup | Jubaea spectabilis | |
Papaya, common | Carica papaya | |
Passionflower, | Passiflora mollissima | |
Passionfruit (yellow lilikoi) | Passiflora edulis flavicarpa | |
Peach | Prunus persica | |
Pear | Pyrus communis | |
Pepino | Solanum muricatum | |
Pepper, bell or chilli | Capsicum annuum | |
Pepper, oriental bush red | Capiscum frutescens var. abbreviatum | |
Pepper, sweet | Capiscum frutescens var. grossum | |
Persimmon | Diospyros spp. | |
Persimmon, Japanese | Diospyros kaki | |
Plum, American | Prunus americana | |
Plum, garden (common European prune) | Prunus domestica | |
Pomegranate | Punica granatum | |
Prickly Pear | Opuntia ficus-indica | |
Prickly pear, mission | Opuntia megacantha | |
Pummelo | Citrus grandis | |
Quince | Cydonia oblonga | |
Rose apple | Eugenia jambos = (Syzygium jambos) | |
Sandalwood | Santalum paniculatum | |
Sandalwood, white | Santalum album | |
Santol | Sandericum koetjape | |
Sapodilla | Manilkara zapota | |
Sapodilla chiku | Achras zapota | |
Sapote, white | Casimiroa edulis | |
Seagrape | Coccoloba uvifera | |
Soursop | Annona muricata | |
Star apple | Chrysophyllum cainito | |
Surinam cherry | Eugenia uniflora | |
Tomato | Lycopersicon esculentum | |
Tropical almond | Terminalia catappa | |
Terminalia | Terminalia chebula | |
Velvet apple | Diospyros discolor | |
Walnut, California black | Juglans hindsii | |
Walnut, English | Juglans regia | |
Wampi | Citrus lansium | |
West Indian cherry | Malpighia punicifolia | |
Ylang-ylang | Cananga odorata |
(d) Restrictions.
1. New
subsection (b)(4) filed 10-5-87 as an emergency; operative 10-5-87 (Register
87, No. 41). A Certificate of Compliance must be transmitted to OAL within 120
days or emergency language will be repealed on 2-2-88. For prior history, see
Register 87, No. 33.
2. New subsection (b)(5) filed 8-1-89 as an
emergency; operative 8-1-89 (Register 89, No. 31). A Certificate of Compliance
must be transmitted to OAL within 120 days or emergency language will be
repealed on 11-29-89.
3. New subsection (b)(6) filed 9-12-89 as an
emergency; operative 9-12-89 (Register 89, No. 43). A Certificate of Compliance
must be transmitted to OAL within 120 days or emergency language will be
repealed on 1-10-90.
4. New subsection (b)(7) filed 10-16-89 as an
emergency; operative 10-16-89 (Register 89, No. 43). A Certificate of
Compliance must be transmitted to OAL within 120 days or emergency language
will be repealed on 2-13-90.
5. Reinstatement of subsection (b)(1)
as it existed prior to emergency amendment filed 7-7-87 by operation of
Government Code section
11346.1(f)
(Register 89, No. 51).
6. Subsection (b)(3) filed as an emergency
7-22-87 repealed by operation of Government Code section
11346.1(g)
(Register 89, No. 51).
7. Repealer of subsection (b)(5) by operation
of Government Code section
11346.1
effective 11-29-89 (Register 90, No. 5).
8. Certificate of
Compliance as to 10-16-89 order transmitted to OAL 2-13-90 and filed 3-14-90
(Register 90, No. 11).
9. New subsection (b)(5) filed 8-6-90 as an
emergency; operative 8-6-90 (Register 90, No. 39). A Certificate of Compliance
must be transmitted to OAL by 12-4-90 or emergency language will be repealed by
operation of law on the following day.
10. Reinstatement of
subsection (b) as it existed prior to 8-6-90 emergency amendment filed 5-21-91
by operation of Government Code section
11346.1(f)
120 days from effective date (Register 91, No. 41).
11. New
subsection (b)(3) filed 10-11-91 as an emergency; operative 10-11-91 (Register
91, No. 51). A Certificate of Compliance must be transmitted to OAL 2-10-92 or
emergency language will be repealed by operation of law on the following
day.
12. Certificate of Compliance as to 10-11-91 order transmitted
to OAL 1-22-92 and filed 2-20-92 (Register 92, No. 12).
13. Repealer
of subsections (b)(1)-(6) and new subsection (b)(1) filed 12-15-92 as an
emergency; operative 12-15-92 (Register 92, No. 51). A Certificate of
Compliance must be transmitted to OAL 4-14-93 or emergency language will be
repealed by operation of law on the following day.
14. Certificate
of Compliance as to 12-15-92 order transmitted to OAL 4-14-93 and filed 4-28-93
(Register 93, No. 18).
15. Repealer and new subsection (b)(1) filed
9-16-93 as an emergency; operative 9-16-93 (Register 93, No. 38). A Certificate
of Compliance must be transmitted to OAL 1-14-94 or emergency language will be
repealed by operation of law on the following day.
16. Certificate
of Compliance as to 9-16-93 order transmitted to OAL 1-6-94 and filed 1-12-94
(Register 94, No. 2).
17. Repealer of subsection (b)(1) filed
6-28-94 as an emergency; operative 6-28-94 (Register 94, No. 26). A Certificate
of Compliance must be transmitted to OAL by 10-26-94 or emergency language will
be repealed by operation of law on the following day.
18. New
subsection (b)(1) filed 10-25-94 as an emergency; operative 10-25-94 (Register
94, No. 43). A Certificate of Compliance must be transmitted to OAL by 3-6-95
or emergency language will be repealed by operation of law on the following
day.
19. Certificate of Compliance as to 6-28-94 order transmitted
to OAL 10-12-94 and filed 11-8-94 (Register 94, No. 45).
20.
Certificate of Compliance as to 10-25-94 order transmitted to OAL 2-21-95 and
filed 3-16-95 (Register 95, No. 11).
21. Repealer and new subsection
(b)(1) filed 7-30-97 as an emergency; operative 7-30-97 (Register 97, No. 31).
A Certificate of Compliance must be transmitted to OAL by 12-1-97 or emergency
language will be repealed by operation of law on the following
day.
22. New subsection (b)(2) filed 8-27-97 as an emergency;
operative 8-27-97 (Register 97, No. 35). A Certificate of Compliance must be
transmitted to OAL by 12-26-97 or emergency language will be repealed by
operation of law on the following day.
23. Amendment of subsection
(b)(2) filed 9-19-97 as an emergency; operative 9-19-97 (Register 97, No. 38).
A Certificate of Compliance must be transmitted to OAL by 1-20-98 or emergency
language will be repealed by operation of law on the following
day.
24. Certificate of Compliance as to 7-30-97 order transmitted
to OAL 11-18-97 and filed 12-2-97 (Register 97, No. 49).
25.
Certificate of Compliance as to 9-19-97 order transmitted to OAL 12-18-97 and
filed 12-31-97 (Register 98, No. 1).
26. Certificate of Compliance
as to 8-27-97 order transmitted to OAL 12-18-97 and filed 1-5-98 (Register 98,
No. 2).
27. Repealer of subsection (b)(1) and subsection renumbering
filed 2-11-98 as an emergency; operative 2-11-98 (Register 98, No. 7). A
Certificate of Compliance must be transmitted to OAL by 6-11-98 or emergency
language will be repealed by operation of law on the following
day.
28. Repealer of subsection (b)(1) filed 3-30-98 as an
emergency; operative 3-30-98 (Register 98, No. 14). A Certificate of Compliance
must be transmitted to OAL by 7-28-98 or emergency language will be repealed by
operation of law on the following day.
29. Certificate of Compliance
as to 2-11-98 order transmitted to OAL 5-6-98 and filed 5-27-98 (Register 98,
No. 22).
30. Certificate of Compliance as to 3-30-98 order
transmitted to OAL 7-7-98 and filed 8-13-98 (Register 98, No.
33).
31. New subsection (b)(1) filed 9-2-99 as an emergency;
operative 9-2-99 (Register 99, No. 36). A Certificate of Compliance must be
transmitted to OAL by 12-31-99 or emergency language will be repealed by
operation of law on the following day.
32. Certificate of Compliance
as to 9-2-99 order, including further amendment of subsection (b)(1),
transmitted to OAL 12-31-99 and filed 2-1-2000 (Register 2000, No.
5).
33. Repealer of subsection (b)(1) filed 3-14-2000 as an
emergency; operative 3-14-2000 (Register 2000, No. 11). A Certificate of
Compliance must be transmitted to OAL by 7-12-2000 or emergency language will
be repealed by operation of law on the following day.
34.
Certificate of Compliance as to 3-14-2000 order transmitted to OAL 7-11-2000
and filed 7-25-2000 (Register 2000, No. 30).
35. New subsection
(b)(1) filed 8-7-2001 as an emergency; operative 8-7-2001 (Register 2001, No.
32). A Certificate of Compliance must be transmitted to OAL by 12-5-2001 or
emergency language will be repealed by operation of law on the following
day.
36. New subsection (b)(2) filed 10-4-2001 as an emergency;
operative 10-4-2001 (Register 2001, No. 40). A Certificate of Compliance must
be transmitted to OAL by 2-1-2002 or emergency language will be repealed by
operation of law on the following day.
37. Certificate of Compliance
as to 8-7-2001 order transmitted to OAL 12-4-2001 and filed 1-14-2002 (Register
2002, No. 3).
38. Certificate of Compliance as to 10-4-2001
emergency transmitted to OAL 2-1-2002 and filed 3-12-2002 (Register 2002, No.
11).
39. Repealer of subsection (b)(2) filed 3-12-2002 as an
emergency; operative 3-12-2002 (Register 2002, No. 11). A Certificate of
Compliance must be transmitted to OAL by 7-10-2002 or emergency language will
be repealed by operation of law on the following day.
40. Repealer
of subsection (b)(1) filed 4-12-2002 as an emergency; operative 4-12-2002
(Register 2002, No. 15). A Certificate of Compliance must be transmitted to OAL
by 8-12-2002 or emergency language will be repealed by operation of law on the
following day.
41. Certificate of Compliance as to 3-12-2002 order
transmitted to OAL 7-2-2002 and filed 7-25-2002 (Register 2002, No.
30).
42. Certificate of Compliance as to 4-12-2002 order transmitted
to OAL 7-2-2002 and filed 8-13-2002 (Register 2002, No. 33).
43. New
subsection (b)(1) filed 8-30-2002 as an emergency; operative 8-30-2002
(Register 2002, No. 35). A Certificate of Compliance must be transmitted to OAL
by 12-30-2002 or emergency language will be repealed by operation of law on the
following day.
44. New subsection (b)(2) filed 12-2-2002 as an
emergency; operative 12-2-2002 (Register 2002, No. 49). A Certificate of
Compliance must be transmitted to OAL by 4-1-2003 or emergency language will be
repealed by operation of law on the following day.
45. Repealer of
subsection (b)(1) and subsection renumbering filed 12-12-2002 as an emergency;
operative 12-12-2002 (Register 2002, No. 50). A Certificate of Compliance must
be transmitted to OAL by 4-11-2003 or emergency language will be repealed by
operation of law on the following day.
46. Certificate of Compliance
as to 12-2-2002 order transmitted to OAL 3-7-2003 and filed 4-15-2003 (Register
2003, No. 16).
47. Certificate of Compliance as to 12-12-2003 order
transmitted to OAL 3-18-2003 and filed 4-21-2003 (Register 2003, No.
17).
48. Repealer of subsection (b)(1) filed 6-12-2003 as an
emergency; operative 6-12-2003 (Register 2003, No. 24). A Certificate of
Compliance must be transmitted to OAL by 10-10-2003 or emergency language will
be repealed by operation of law on the following day.
49.
Certificate of Compliance as to 6-12-2003 order transmitted to OAL 9-16-2003
and filed 10-14-2003 (Register 2003, No. 42).
50. New subsection
(b)(1) filed 10-27-2003 as an emergency; operative 10-27-2003 (Register 2003,
No. 44). A Certificate of Compliance must be transmitted to OAL by 2-24-2004 or
emergency language will be repealed by operation of law on the following
day.
51. Certificate of Compliance as to 10-27-2003 order
transmitted to OAL 2-24-2004 and filed 3-23-2004 (Register 2004, No.
13).
52. Repealer of subsection (b)(1) filed 5-27-2004 as an
emergency; operative 5-27-2004 (Register 2004, No. 22). A Certificate of
Compliance must be transmitted to OAL by 9-24-2004 or emergency language will
be repealed by operation of law on the following day.
53. New
subsection (b)(1) filed 7-9-2004 as an emergency; operative 7-9-2004 (Register
2004, No. 28). A Certificate of Compliance must be transmitted to OAL by
11-8-2004 or emergency language will be repealed by operation of law on the
following day.
54. New subsection (b)(2) filed 9-8-2004 as an
emergency; operative 9-8-2004 (Register 2004, No. 37). A Certificate of
Compliance must be transmitted to OAL by 1-6-2005 or emergency language will be
repealed by operation of law on the following day.
55. Certificate
of Compliance as to 5-27-2004 order transmitted to OAL 9-3-2004 and filed
10-14-2004 (Register 2004, No. 42).
56. Certificate of Compliance as
to 7-9-2004 order transmitted to OAL 10-19-2004 and filed 11-29-2004 (Register
2004, No. 49).
57. Reinstatement of section as it existed prior to
9-8-2004 emergency amendment by operation of Government Code section
11346.1(f)
(Register 2005, No. 3).
58. Repealer of subsection (b)(1) filed
2-23-2005 as an emergency; operative 2-23-2005 (Register 2005, No. 8). A
Certificate of Compliance must be transmitted to OAL by 6-23-2005 or emergency
language will be repealed by operation of law on the following
day.
59. Certificate of Compliance as to 2-23-2005 order transmitted
to OAL 5-31-2005 and filed 7-11-2005 (Register 2005, No. 28).
60.
New subsection (b)(1) filed 9-8-2006 as an emergency; operative 9-8-2006
(Register 2006, No. 36). A Certificate of Compliance must be transmitted to OAL
by 1-8-2007 or emergency language will be repealed by operation of law on the
following day.
61. New subsection (b)(2) filed 11-13-2006 as an
emergency; operative 11-13-2006 (Register 2006, No. 46). A Certificate of
Compliance must be transmitted to OAL by 3-13-2007 or emergency language will
be repealed by operation of law on the following day.
62. Repealer
of subsection (b)(1) and subsection renumbering filed 12-20-2006 as an
emergency; operative 12-20-2006 (Register 2006, No. 51). A Certificate of
Compliance must be transmitted to OAL by 4-19-2007 or emergency language will
be repealed by operation of law on the following day.
63.
Certificate of Compliance as to 9-8-2006 order transmitted to OAL 12-29-2006
and filed 1-18-2007 (Register 2007, No. 3).
64. Certificate of
Compliance as to 11-13-2006 order transmitted to OAL 2-20-2007 and filed
3-7-2007 (Register 2007, No. 10).
65. Repealer and reservation of
subsection (b)(1) filed 7-20-2007 as an emergency; operative 7-20-2007
(Register 2007, No. 29). A Certificate of Compliance must be transmitted to OAL
by 1-16-2008 or emergency language will be repealed by operation of law on the
following day.
66. Certificate of Compliance as to 7-20-2007 order,
including further amendment of subsection (b)(1) [Reserved], transmitted to OAL
12-6-2007 and filed 1-18-2008 (Register 2008, No. 3).
67. New
subsection (b)(1) filed 8-25-2008 as an emergency; operative 8-25-2008
(Register 2008, No. 35). A Certificate of Compliance must be transmitted to OAL
by 2-23-2009 or emergency language will be repealed by operation of law on the
following day.
68. Amendment of subsection (b)(1) filed 10-14-2008
as an emergency; operative 10-14-2008 (Register 2008, No. 42). A Certificate of
Compliance must be transmitted to OAL by 4-13-2009 or emergency language will
be repealed by operation of law on the following day.
69. Amendment
of subsection (b)(1) filed 10-17-2008 as an emergency; operative 10-17-2008
(Register 2008, No. 42). A Certificate of Compliance must be transmitted to OAL
by 4-15-2009 or emergency language will be repealed by operation of law on the
following day.
70. Certificate of Compliance as to 8-25-2008,
10-14-2008 and 10-17-2008 orders transmitted to OAL 2-18-2009 and filed
3-23-2009 (Register 2009, No. 13).
71. Repealer and reservation of
subsection (b)(1) filed 7-2-2009 as an emergency; operative 7-2-2009 (Register
2009, No. 27). A Certificate of Compliance must be transmitted to OAL by
12-29-2009 or emergency language will be repealed by operation of law on the
following day.
72. New subsection (b)(1) filed 8-4-2009 as an
emergency; operative 8-4-2009 (Register 2009, No. 32). A Certificate of
Compliance must be transmitted to OAL by 2-1-2010 or emergency language will be
repealed by operation of law on the following day.
73. Readoption of
7-2-2009 emergency order filed 12-29-2009 as an emergency; operative 12-29-2009
(Register 2010, No. 1). A Certificate of Compliance must be transmitted to OAL
by 3-29-2010 or emergency language will be repealed by operation of law on the
following day.
74. Certificate of Compliance as to 12-29-2009 order
transmitted to OAL 1-19-2010 and filed 3-3-2010 (Register 2010, No.
10).
75. Reinstatement of subsection (b)(1) as it existed prior to
8-4-2009 emergency amendment by operation of Government Code section
11346.1(f)
(Register 2010, No. 12).
76. New subsection (b)(1) filed 3-17-2010;
operative 3-17-2010 pursuant to Government Code section
11343.4(c)
(Register 2010, No. 12).
77. Repealer of subsection (b)(1) filed
5-4-2010 as an emergency; operative 5-4-2010 (Register 2010, No. 19). A
Certificate of Compliance must be transmitted to OAL by 11-1-2010 or emergency
language will be repealed by operation of law on the following
day.
78. Amendment of subsection (b) filed 6-30-2010 as an
emergency; operative 6-30-2010 (Register 2010, No. 27). A Certificate of
Compliance must be transmitted to OAL by 12-27-2010 or emergency language will
be repealed by operation of law on the following day.
79. Amendment
adding new subsection (b)(1) and redesignating a portion of subsection (b) as
subsection (b)(2) filed 8-5-2010 as an emergency; operative 8-5-2010 (Register
2010, No. 32). A Certificate of Compliance must be transmitted to OAL by
2-1-2011 or emergency language will be repealed by operation of law on the
following day.
80. Certificate of Compliance as to 5-4-2010 order
transmitted to OAL 7-20-2010 and filed 8-19-2010 (Register 2010, No.
34).
81. Repeal of 6-30-2010 emergency amendment by operation of
Government Code section
11346.1(f)
(Register 2011, No. 6).
82. Certificate of Compliance as to 8-5-2010
order transmitted to OAL 12-31-2010 and filed 2-10-2011 (Register 2011, No.
6).
83. Amendment of subsection (a), new subsection (b)(2) and
amendment of subsection (c)(1) filed 9-19-2011 as an emergency; operative
9-19-2011 (Register 2011, No. 38). A Certificate of Compliance must be
transmitted to OAL by 3-19-2012 or emergency language will be repealed by
operation of law on the following day.
84. Repealer of subsection
(b)(1) and subsection renumbering filed 10-10-2011; operative 11-9-2011
(Register 2011, No. 41).
85. New subsection (b)(1), subsection
renumbering and amendment of newly designated subsection (b)(3) filed
10-19-2011 as an emergency; operative 10-19-2011 (Register 2011, No. 42). A
Certificate of Compliance must be transmitted to OAL by 4-16-2012 or emergency
language will be repealed by operation of law on the following
day.
86. Editorial correction of HISTORY 85 (Register 2012, No.
5).
87. Certificate of Compliance as to the 9-19-2011 order and as
to the amendment of subsection (b)(3) in the 10-19-2011 order, including
further amendment, transmitted to OAL 1-3-2011 and filed 2-2-2012 (Register
2012, No. 5).
88. Certificate of Compliance as to 10-19-2011 order
transmitted to OAL 4-10-2012 and filed 5-1-2012 (Register 2012, No.
18).
89. Amendment of subsection (b)(2) filed 8-9-2013 as an
emergency; operative 8-9-2013 (Register 2013, No. 32). A Certificate of
Compliance must be transmitted to OAL by 2-5-2014 or emergency language will be
repealed by operation of law on the following day.
90. New
subsection (b)(1) [formerly reserved], repealer and new subsection (b)(2), new
subsections (b)(2)A.-C., repealer and new subsection (b)(3) and new subsections
(b)(4)-(6) filed 2-20-2014; operative 4-1-2014 (Register 2014, No.
8).
91. Certificate of Compliance as to 8-9-2013 order transmitted
to OAL 2-4-2014 and filed 3-18-2014 (Register 2014, No. 12).
Note: Authority cited: Sections 407, 5301, 5302 and 5322, Food and Agricultural Code. Reference: Sections 5301, 5302 and 5322, Food and Agricultural Code.