California Code of Regulations
Title 27 - Environmental Protection
Division 2 - Solid Waste
Subdivision 1 - Consolidated Regulations for Treatment, Storage, Processing or Disposal of Solid Waste
Chapter 4 - Documentation and Reporting for Regulatory Tiers, Permits, WDRs, and Plans
Subchapter 4 - Development of Closure/Postclosure Maintenance Plans
Section 21780 - CIWMB-Submittal of Closure and Postclosure Maintenance Plans
Current through Register 2024 Notice Reg. No. 38, September 20, 2024
(a) Each submittal shall be certified by a registered civil engineer or a certified engineering geologist. Each submittal shall include:
(b) The operator shall submit two copies of each document to the EA, the RWQCB, the CIWMB and the local air district. All drawings shall be submitted at an appropriate scale that clearly shows all pertinent features. The closure and postclosure maintenance plans shall be clearly marked "preliminary" or "final", depending on the status. For partial final closure, those sections submitted pursuant to § 21800, shall be clearly marked "partial final."
(c) Plans for complete site closure of a solid waste landfill shall be submitted in accordance with the following schedule:
(d) Partial final closure of a solid waste landfill shall be allowed in accordance with the following:
(e) If immediate closure of a disposal site is necessary to protect public health and safety and the environment, closure plans shall be submitted in accordance with a schedule specified by the EA and concurred with by the RWQCB and CIWMB. If the RWQCB or CIWMB does not object to the schedule within 30 days of written notification by the EA, the schedule is deemed concurred with by that agency. An emergency corrective action plan may be required by the EA, to be submitted for approval by the EA. The emergency corrective action plan may be implemented prior to the submittal of the closure plan.
(f) If, at its own motion, an operator ceases accepting waste at a landfill prior to the anticipated closure date specified in the currently effective Solid Waste Facility Permit, and the operator does not intend to receive additional waste at the landfill, the operator shall submit final closure and postclosure maintenance plans in accordance with a schedule specified by the EA and concurred with by the RWQCB and CIWMB. If the RWQCB or CIWMB does not object to the schedule within 30 days of written notification by the EA, the schedule is deemed concurred with by that agency. In no case shall the schedule be longer than six (6) months from the date the operator ceased accepting waste at the landfill.
(g) The owner or operator of a MSWLF unit shall notify the EA that closure and postclosure maintenance plans have been prepared and placed in the operating record in accordance with 40 CFR 258.60(d) and 258.61(d).
1. New section filed 6-18-97; operative 7-18-97 (Register 97, No. 25).
2. Amendment of subsections (b)-(e), new subsection (f), subsection relettering and amendment of NOTE filed 2-25-2003; operative 2-25-2003 pursuant to Government Code section 11343.4 (Register 2003, No. 9).
3. Amendment of section heading, subsection (a)(2) and NOTE filed 2-25-2008; operative 2-25-2008 pursuant to Government Code section 11343.4 (Register 2008, No. 9).
Note: Authority cited: Section 40502, Public Resources Code. Reference: Sections 43020, 43021, 43022 and 43103, Public Resources Code.