California Code of Regulations
Title 25 - Housing and Community Development
Division 1 - Housing and Community Development
Chapter 2.2 - Special Occupancy Parks
Article 1 - Administration and Enforcement
Section 2020.3 - Application Requirements for Permits for Accessory Structures and Camping Cabins
Current through Register 2024 Notice Reg. No. 38, September 20, 2024
(a) A person required to obtain a permit to install an accessory structure or camping cabin, shall submit an application for the permit to construct to the enforcement agency, on a form prescribed by that agency.
(b) The application for the permit to construct shall be accompanied by fees as specified in section 2020.7 of this article, or section 2020.4 when using plans with a standard plan approval.
(c) A person submitting an application for a permit to construct an accessory structure or install a camping cabin shall, in addition to the requirements of section 2034 of this chapter, submit three (3) copies of a plot plan for the lot where the accessory structure or camping cabin is to be constructed, on the form prescribed by the department, indicating the planned location of the accessory structure or camping cabin on the lot and all required dimensions and setbacks from the lot lines and structures on the same and adjoining lots. At least one (1) copy of the plot plan shall bear the original signature of the park owner or his or her designated representative.
(d) When a person files applications simultaneously to construct or install two (2) or more accessory structures or camping cabins which are identical and are within the same park, only one (1) plan check fee shall be required.
(e) If an application for a permit to construct is in complete or does not conform to this chapter, the enforcement agency shall notify the applicant in what respects application does not comply in writing within ten 10 working days of the date they are received by the department. The applicant shall resubmit a corrected application or plans within ninety (90) days of the notification, or within 90 days of any subsequent notification relating to a resubmittal, along with the resubmission fees required by subsections 2020.4 or 2020.7 of this chapter as applicable.
(f) A single permit may be issued for all accessory structures to be erected or installed concurrently on the same lot including electrical, mechanical and plumbing installations in each accessory structure. If the applicant requests individual permits, they may be obtained for structural, electrical, mechanical and plumbing installations, and are subject to separate individual fees.
1. New section filed 7-6-2004; operative 7-6-2004 pursuant to Government Code section 11343.4 (Register 2004, No. 28).
Note: Authority cited: Sections 18865 and 18871.3, Health and Safety Code. Reference: 18865, 18870, 18870.5 and 18871.3, Health and Safety Code.