California Code of Regulations
Title 23 - Waters
Division 3 - State Water Resources Control Board and Regional Water Quality Control Boards
Chapter 16 - Underground Tank Regulations
Appendix VIII - Underground Storage Tank Spill Container Testing Report Form
TYPE OF ACTION | [] Installation | [] Repair | []12 Month |
1. FACILITY INFORMATION
CERS ID | Test Date | |
___________________________ | ||
Facility Name | ||
___________________________ | ||
Facility Address | City | ZIP Code |
___________________________ |
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Test | Phone | |
___________________________ | ||
Mailing Address | ||
___________________________ | ||
Service Technician Performing Test | ||
___________________________ | ||
Contractor/Tank Tester License Number | ||
___________________________ | ||
ICC Number | ICC Expiration Date | |
___________________________ |
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications | Expiration Date |
___________________________ | |
___________________________ | |
___________________________ | |
___________________________ |
4. TEST PROCEDURE INFORMATION
Test Procedures Used | Components Tested |
___________________________ | |
___________________________ | |
___________________________ | |
___________________________ |
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that each spill container was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.1; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority.
Service Technician Signature | Date | Total # of Pages |
___________________________ |
CERS = California Environmental Reporting System, ID = Identification, ICC = International Code Council
6. SPILL CONTAINER DETAILS
Test Method Developed by | [] Manufacturer | [] Industry Standard | [] Professional Engineer | ||
Test Type | [] Pressure | [] Vacuum | [] Hydrostatic | ||
Tank ID | |||||
Spill Container Manufacturer: | |||||
Method of Cathodic Protection | [] Nonmetallic | [] Nonmetallic | [] Nonmetallic | [] Nonmetallic | |
[] Other | [] Other | [] Other | [] Other | ||
Is the spill container minimum capacity five gallons excluding riser volume | [] Yes | [] Yes | [] Yes | [] Yes | |
[] No* | [] No* | [] No* | [] No* | ||
Method to keep spill container empty | [] Drain | [] Drain | [] Drain | [] Drain | |
[] Pump | [] Pump | [] Pump | [] Pump | ||
[] Other | [] Other | [] Other | [] Other | ||
Spill Container Test Results | [] Pass | [] Pass | [] Pass | [] Pass | |
[] Fail | [] Fail | [] Fail | [] Fail | ||
Tank ID | |||||
Spill Container Manufacturer: | |||||
Method of Cathodic Protection | [] Nonmetallic | [] Nonmetallic | [] Nonmetallic | [] Nonmetallic | |
[] Other | [] Other | [] Other | [] Other | ||
Is the spill container minimum capacity five gallons excluding riser volume | [] Yes | [] Yes | [] Yes | [] Yes | |
[] No* | [] No* | [] No* | [] No* | ||
Method to keep spill container empty | [] Drain | [] Drain | [] Drain | [] Drain | |
[] Pump | [] Pump | [] Pump | [] Pump | ||
[] Other | [] Other | [] Other | [] Other | ||
Spill Container Test Results | [] Pass | [] Pass | [] Pass | [] Pass | |
[] Fail | [] Fail | [] Fail | [] Fail |
8. COMMENTS
Describe all answers marked "Other," "No," or "Fail" and each proposed remedy.
* Mark here if:
[] Spill containers do not have a minimum capacity of five gallons and require replacement.
Additional copies of this page may be attached.
1. New
Appendix VIII filed 8-27-2018; operative 10-1-2018 (Register 2018, No.
35).
2. Repealer and new appendix filed 8-27-2020; operative
10-1-2020 (Register 2020, No. 35). Filing deadline specified in Government Code
section
11349.3(a)
extended 60 days pursuant to Executive Order N-40-20 and an additional 60 days
pursuant to Executive Order N-66-20.