California Code of Regulations
Title 20 - Public Utilities and Energy
Division 2 - State Energy Resources Conservation and Development Commission
Chapter 5 - Power Plant Site Certification
Article 1 - General Provisions Applicable to Notices of Intent and Applications for Certification
B - Filing and Information Requirements for Notices and Applications
Section 1704 - Information Requirements for Notices of Intent and Applications for Certification
Current through Register 2024 Notice Reg. No. 38, September 20, 2024
(a) General Requirements. All notices and applications shall conform to the following requirements:
(b) The informational requirements for notices and applications are contained in this section and in appendices to this Chapter. Maps required in this section and in the appendices shall be provided at the scale specified in the appendices, except that applicants may provide maps at a different scale if the maps are legible and if a written explanation of why this different scale is more appropriate is included in the notice or application. The term region means a geographic area that is normally contiguous and exhibits similar geographic characteristics. The term vicinity means both that area in close proximity to the project site and which receives a preponderance of the direct impacts of the project. The area referred to by the terms vicinity and region will overlap, although, in most circumstances, the vicinity will be part of the region. The size of the region and vicinity that should be discussed in the filing will vary depending on the project's location (e.g., rural, urban, coastal), its technology (e.g., nuclear, coal, geothermal), and by technical area. Applicants should use their professional judgment in determining the appropriate size of the region and vicinity to be discussed in the application. A statement explaining the extent of the area described for each technical area shall be included.
(c) Information requirements for applications. The application for certification shall contain all the information required by Appendix B of this article (for nongeothermal projects) or Appendices B or C of Article 4 (for geothermal projects) and any information required by the decision on the notice (see Section 1805, Article 4 for geothermal requirements).
1.
Amendment of subsection (a)(2) filed 1-11-83; designated effective 2-1-83
pursuant to Government Code section
11346.2(d)
(Register 83, No. 3).
2. Amendment of subsection (a)(1) and NOTE,
repealer of subsections (b)-(c) and new subsections (b)-(b)(5) filed 8-10-93;
operative 9-9-93 (Register 93, No. 33).
3. Editorial correction of
printing error in subsection (a)(2) (Register 93, No. 33).
4.
Amendment of subsections (b) and (b)(2), repealer of subsections (b)(2)(A)-(B)
and amendment of NOTE filed 4-17-96; operative 5-17-96 (Register 96, No.
16).
5. Amendment of section heading and subsection (b), repealer of
subsection (b)(5) and amendment of NOTE filed 12-5-2018; operative 1-1-2019
pursuant to Government Code section
11343.4(b)(3)
(Register 2018, No. 49).
Note: Authority cited: Sections 25213, 25216.5(a), 25218(e) and 25541.5, Public Resources Code. Reference: Sections 21080.5, 25308.5, 25504, 25519(a), 25519(c), 25520, 25522(b), 25523(d)(1), 25540.1, 25540.2 and 25540.6, Public Resources Code.