(b) Offset Verification Services. Offset
Verification Services shall be subject to the following requirements.
(1) Notice of Offset Verification Services
for Offset Projects. Before offset verification services, as defined in section
95977.1(b)(3),
may begin, the Offset Project Operator or Authorized Project Designee must
submit the Offset Project Data Report to ARB or an Offset Project Registry, and
the verification body must submit a Notice of Offset Verification Services to
ARB and an Offset Project Registry, if applicable. The verification body may
begin offset verification services for the Offset Project Operator or
Authorized Project Designee 10 calendar days after the Notice for Offset
Verification Services is received by ARB and the Offset Project Registry. The
verification body may not conduct the site visit until at least 15 calendar
days after the Notice for Offset Verification Services is received by ARB and
the Offset Project Registry. If a verification is being audited by ARB pursuant
to section
95977.1(b)(3)(W)
or by an Offset Project Registry pursuant to section
95987(e) and if
ARB or the Offset Project Registry notify the verification body of the audit in
writing within five working days of receiving the Notice for Offset
Verification Services, the verification body may not conduct the site visit
until at least 40 calendar days after the Notice for Offset Verification
Services is received by ARB and the Offset Project Registry, unless each
auditing entity approves in writing an earlier site visit date. The Notice of
Offset Verification Services must include the following information:
(A) The offset project name and its
identification numbers, the Compliance Offset Protocol and its version under
which the offset project is reporting, indication of whether a single or
multiple reporting periods will receive offset verification services, the
reporting period start and end dates, and the crediting period start
date;
(B) A list of staff who will
be designated to provide offset verification services as part of an offset
verification team, including the names of each designated staff member, the
lead verifier, independent reviewer, all subcontractors, and a description of
the roles and responsibilities each team member will have during the offset
verification process;
(C)
Documentation that the offset verification team has the skills required to
provide offset verification services for the Offset Project Operator or
Authorized Project Designee. At least one offset verification team member must
be accredited by ARB as an offset project specific verifier for an offset
project of that type; and
(D)
General information on the Offset Project Operator or Authorized Project
Designee, including:
1. The name of the
Offset Project Operator or Authorized Project Designee, including contact
information, address, telephone number, and email address;
2. The locations that will be subject to
offset verification services;
3.
The date(s) of on-site visits, with address and contact information;
and
4. A brief description of
expected offset verification services to be performed, including the expected
date for submitting the Offset Verification Statement to ARB or the Offset
Project Registry.
(2) If any information submitted pursuant to
sections 95977.1(b)(1)(B)
and 95977.1(b)(1)(D)
changes after the Notice for Offset Verification Services is submitted to ARB
and the Offset Project Registry, if applicable, the verification body must
notify ARB and the Offset Project Registry by submitting an updated Notice of
Offset Verification Services within 10 working days. If the verification body
has been notified by ARB or the Offset Project Registry of an audit for the
relevant verification, then the verification body must notify the auditing
entity at least two working days prior to a revised start date for offset
verification services and at least 15 working days prior to a revised site
visit date(s), unless each auditing entity approves in writing an earlier date.
If ARB and the Offset Project Registry, if applicable, request revisions to the
Notice of Offset Verification Services, the verification body must resubmit the
revised Notice of Offset Verification Services within 10 working days of such
request, or if there is a reason the verification body cannot submit the
revisions within 10 working days, the verification body must communicate to ARB
and the Offset Project Registry in writing as to the reasons why and get
approval from the Offset Project Registry or ARB for an extension.
(3) Offset verification services must include
the following:
(A) Offset Verification Plan.
The Offset Project Operator or Authorized Project Designee must submit the
following information necessary to develop an Offset Verification Plan to the
offset verification team:
1. Information to
allow the offset verification team to develop a general understanding of offset
project boundaries, operations, project baseline emissions, and Reporting
Period GHG reductions and GHG removal enhancements;
2. Information regarding the training or
qualifications of personnel involved in developing the Offset Project Data
Report;
3. The name and date of the
Compliance Offset Protocol used to quantify and report project baselines, GHG
reductions, GHG removal enhancements, and other required data as applicable in
the Compliance Offset Protocol; and
4. Information about any data management
system, offset project monitoring system, and models used to track project
baselines, GHG reductions, GHG removal enhancements, and other required data as
applicable in the Compliance Offset Protocol.
(B) Timing of Offset Verification Services.
The Offset Verification Plan submitted pursuant to section
95977.1(b)(3)(A)
shall also include the following information:
1. Dates of proposed meetings and interviews
with personnel related to the offset project;
2. Dates of proposed site visits;
3. Types of proposed document and data
reviews; and
4. Expected date for
completing offset verification services.
(C) Planning Meetings with the Offset Project
Operator or Authorized Project Designee. The offset verification team must
discuss with the Offset Project Operator or Authorized Project Designee the
scope of the offset verification services and request any information and
documents needed for initiating offset verification services. The offset
verification team must review the documents submitted and plan and conduct a
review of original documents and supporting data for the Offset Project Data
Report. Information regarding planning meetings may be included in the offset
verification plan, but is not required. Any discussions or meetings to secure
an offset verification services contract or collect preliminary project
documents to bid the offset verification services may occur prior to submitting
the Notice of Offset Verification Services pursuant to section
95977.1(b)(1).
(D) Site Visits for Offset Projects. For a
non-sequestration offset project, at least one accredited offset verifier in
the offset verification team, including the offset project specific verifier,
must make at least one site visit for each Reporting Period that an Offset
Project Data Report is submitted, except for those non-sequestration offset
projects for which the Offset Project Data Reports qualify for a two-year
offset verification period pursuant to section
95977(b). In this
case, at least one offset verifier in the offset verification team, including
the offset project specific verifier, must make a site visit each time offset
verification services are performed; offset verification services for
non-sequestration offset projects would include one or two Reporting Periods,
depending on whether verification is eligible to be deferred pursuant to
section 95977(b). For
projects using protocols in section
95973(a)(2)(C)1.,
2., or 3., if the project is no longer in operation and all destruction
devices, metering and monitoring equipment has been removed, the site visit can
occur at the offices of the Offset Project Operator, or Authorized Project
Designee. Such a site visit cannot be used for reducing the invalidation
timeframe in section
95985. For a forest or urban
forest offset project, at least one accredited offset verifier in the offset
verification team, including the offset project specific verifier, must make a
site visit every year that offset verification services are provided, except
for those offset projects approved for less intensive verification, for which a
site visit must be performed at least once every six years. A site visit is
also required after the first Reporting Period of an offset project under a
Compliance Offset Protocol and after the first Reporting Period for each
renewed crediting period under a Compliance Offset Protocol. Any site visit
performed under this section must be conducted after the Offset Project
Operator or Authorized Project Designee submits its Offset Project Data Report
to ARB or an Offset Project Registry. During the required verification, the
offset verification team member(s) must conduct the following, and document or
explain how each requirement was checked and fulfilled in the detailed
verification report:
1. During the initial
verification conducted following the first Reporting Period of the crediting
period the offset verification team members must complete all of the following
requirements, either during the required site visit or as part of a desk
review:
a. Assess offset project eligibility
and that the offset project meets the requirements for additionality according
to section
95973 and the applicable
Compliance Offset Protocol;
b.
Review the information submitted for listing pursuant to section
95975 and determine if it is
complete and accurate;
c. Confirm
that the offset project boundary is appropriately defined;
d. Review project baseline calculations and
modeling;
e. Assess the operations,
functionality, data control systems, and review GHG measurement and monitoring
techniques; and
f. Confirm that all
applicable eligibility criteria to design, measure, establish the chain of
custody, and monitor the offset project conforms to the requirements of the
applicable Compliance Offset Protocol.
g. All criteria pertaining to the eligibility
of the offset project must be assessed during the first site visit in the first
Reporting Period of each crediting period. All eligibility criteria must be met
and are not subject to sampling. If any of the eligibility criteria are not
met, the project would be ineligible for crediting and receive an Adverse
Offset Verification Statement.
2. During the initial verification conducted
following the first Reporting Period of the crediting period and each
subsequent verification the offset verification team must complete all of the
following requirements, either during the required site visit or as part of a
desk review:
a. Check that all offset project
boundaries, GHG emissions sources, GHG sinks, and GHG reservoirs in the
applicable Compliance Offset Protocol are identified appropriately;
b. Review and understand the data management
systems used by the Offset Project Operator or Authorized Project Designee to
track, quantify, and report GHG reductions, GHG removal enhancements, or other
data required as applicable in the Compliance Offset Protocol. This includes
reviewing data collection processes and procedures, sampling techniques and
metering accuracy, quality assurance/quality control processes and procedures,
and missing data procedures. The offset verification team member(s) must
evaluate the uncertainty and effectiveness of these systems;
c. Interview key personnel involved in
collecting offset project data and preparing the Offset Project Data
Report;
d. Make direct observations
of equipment for data sources and equipment supplying data for GHG emission
sources in the sampling plan determined to be high risk;
e. Collect and review other information that,
in the professional judgment of the team, is needed in the offset verification
process;
f. Confirm the offset
project conforms with all local, state, or federal environmental regulatory
requirements pursuant to section
95973(b),
including health and safety regulations; and
g. Review all chain of custody documents as
required in the Compliance Offset Protocol, if applicable.
h. If the offset project is found by the
offset verification team to not meet the requirements of section
95977.1(b)(3)(D)2.f.,
the offset project is ineligible to receive ARB offset credits or registry
offset credits for some or all GHG reductions and GHG removal enhancements
quantified and reported in the Offset Project Data
Report.
(E) The
offset verification team must review offset project operations to identify
applicable GHG emissions sources, project emissions, GHG sinks, and GHG
reservoirs required to be included and quantified in the Offset Project Data
Report as required by the applicable Compliance Offset Protocol. This must
include a review of each type of GHG emissions source, GHG sink, and GHG
reservoir to ensure that all GHG emissions sources, GHG sinks, and GHG
reservoirs required to be reported for the offset project are properly included
in the Offset Project Data Report.
(F) An Offset Project Operator or Authorized
Project Designee must make available to the offset verification team all
information and documentation used to calculate and report project baseline and
project GHG emissions, GHG reductions, and GHG removal enhancements and other
information required by the applicable Compliance Offset Protocol.
(G) Sampling Plan for Offset Project Data
Reports. As part of confirming the Offset Project Data Report, the offset
verification team must develop a sampling plan that meets the following
requirements:
1. The offset verification team
must develop a sampling plan based on a strategic analysis developed from
document reviews and interviews to assess the likely nature, scale, and
complexity of the offset verification services for an Offset Project Operator
or Authorized Project Designee. The analysis must review the inputs for the
development of the submitted Offset Project Data Report, the rigor and
appropriateness of the GHG data management systems, and the coordination within
an Offset Project Operator's or Authorized Project Designee's organization to
manage the operation and maintenance of equipment and systems used to develop
the Offset Project Data Reports;
2.
The offset verification team must include a ranking of GHG emissions sources,
GHG sinks, and GHG reservoirs within the offset project boundary by amount of
contribution to total CO2e emissions, GHG reductions,
and GHG removal enhancements, and a ranking of GHG emissions sources, GHG
sinks, or GHG reservoirs with the largest calculation uncertainty;
and
3. The offset verification team
must include a qualitative narrative of uncertainty risk assessment in the
following areas as applicable to the Compliance Offset Protocol:
a. Data acquisition equipment;
b. Data sampling and frequency;
c. Data processing and tracking;
d. Project baseline and project GHG
emissions, GHG reductions, and GHG removal enhancement calculations;
e. Data reporting; and
f. Management policies or practices in
developing Offset Project Data Reports.
(H) After completing the analysis in section
95977.1(b)(3)(G),
the offset verification team must include in the sampling plan a list which
includes the following:
1. GHG emissions
sources, GHG sinks, and GHG reservoirs that will be targeted for document
reviews to ensure conformance with the Compliance Offset Protocol and data
checks as specified in section
95977.1(b)(3)(L)
and an explanation of why they were chosen;
2. Methods used to conduct data checks for
each GHG emissions source, GHG sink, and GHG reservoir; and
3. A summary of the information analyzed in
the data checks and document reviews conducted for each GHG emissions source,
GHG sink, and GHG reservoir.
(I) The sampling plan list, prepared pursuant
to section
95977.1(b)(3)(H),
must be updated and finalized prior to the completion of offset verification
services. The final sampling plan must describe in detail how the GHG emissions
sources, GHG sinks, and GHG reservoirs with identified risk, subject to data
checks, were reviewed for accuracy.
(J) The offset verification team must revise
the sampling plan to describe tasks completed or needed to be completed by the
offset verification team as relevant information becomes available and
potential issues emerge of offset material misstatement or nonconformance with
the requirements of the Compliance Offset Protocol and this article.
(K) The verification body must retain the
sampling plan in paper, electronic, or other format for a period of not less
than 15 years following the submission of each Offset Verification Statement.
The sampling plan must be made available at any time during offset verification
services to ARB or the Offset Project Registry within 10 calendar days upon
request. The verification body must also retain all material received,
reviewed, or generated to render an Offset Verification Statement for an Offset
Project Operator or Authorized Project Designee for 15 years following the
submittal of each Offset Verification Statement. The documentation must allow
for a transparent review of how a verification body reached its conclusion in
the detailed verification report and Offset Verification Statement.
(L) Data Checks for Offset Project Data
Reports. To determine the reliability of the submitted Offset Project Data
Report, the offset verification team must use data checks. Such data checks
must focus first on the largest and most uncertain estimates of project
baseline GHG emissions, project emissions, GHG reductions, and GHG removal
enhancements, and the offset verification team must:
1. Use data checks to ensure that the
appropriate methodologies and GHG emission factors have been applied in
calculating the project baseline and Reporting Period GHG emissions, project
emissions, GHG reductions, and GHG removal enhancements calculations in the
Compliance Offset Protocol;
2.
Choose GHG emissions sources, project emissions, GHG sinks, and GHG reservoirs
for data checks based on their relative sizes and risks of offset material
misstatement or nonconformance as indicated in the sampling plan;
3. Use professional judgment in the number of
data checks required for the offset verification team to conclude with
reasonable assurance whether the Offset Project Operator's or Authorized
Project Designee's total reported GHG reductions and GHG removal enhancements
are free of offset material misstatement and the Offset Project Data Report
otherwise conforms to the requirements of the Compliance Offset Protocol and
this article. At a minimum a data check must include the following:
a. Tracing data in the Offset Project Data
Report to its origin;
b. Looking at
the process for data compilation and collection;
c. Reviewing all GHG inventory designs for
GHG sources, GHG sinks, and GHG reservoirs, and sampling procedures, if
applicable;
d. Recalculating
baseline GHG emissions, project emissions, GHG reductions, and GHG removal
enhancements estimates to check original calculations;
e. Reviewing calculation methodologies used
by the Offset Project Operator or Authorized Project Designee for conformance
with the Compliance Offset Protocol and this article;
f. Reviewing meter and fuel analytical
instrumentation calibration, if applicable; and
g. Reviewing the quantification from models
approved for use in the Compliance Offset Protocol, if applicable;
and
4. Compare its own
calculated results for the data checks conducted with the reported offset
project data in order to confirm the extent and impact of any omissions and
errors. Any discrepancies must be identified in the issues log. The comparison
of data checks must also include a narrative to indicate which GHG emissions
sources, GHG sinks, and GHG reservoirs were checked, the types and quantity of
data that were evaluated for each GHG emissions source, GHG sink, and GHG
reservoir, how the data checks were conducted including calculations, and any
discrepancies that were identified.
(M) Offset Project Data Report Modifications.
As a result of review by the offset verification team and prior to completion
of an Offset Verification Statement, the Offset Project Operator or Authorized
Project Designee must make any possible improvements and fix correctable errors
that affect GHG emissions reductions or removal enhancements in the submitted
Offset Project Data Report, and a revised Offset Project Data Report must be
submitted to ARB or the Offset Project Registry. Correctable errors that, when
summed, result in less than a three percent (3.00%) overstatement of the GHG
emissions reductions or removal enhancements do not need to be fixed. Errors
subject to the three percent exception still constitute errors for purposes of
this Regulation, and the Offset Project Operator and Authorized Project
Designee, if applicable, are still subject to the requirements of sections
96013 and
96014(d). The
revised Offset Project Data Report must include all components required in
section 95976(d). If the
Offset Project Operator or Authorized Project Designee does not make all
possible improvements and fix any correctable errors to the Offset Project Data
Report, the verification body must issue an Adverse Offset Verification
Statement. The offset verification team shall use professional judgment in the
determination of correctable errors, including whether differences are not
errors but result from truncation or rounding. The offset verification team
must document in the issues log the source of any difference identified,
including whether the difference results in a correctable error. Documentation
for all Offset Project Data Report submittals must be retained by the Offset
Project Operator or Authorized Project Designee for the length of time
specified in section
95976(e)(2).
(N) To verify that the Offset Project Data
Report is free of offset material misstatement, the offset verification team
must make its own determination of GHG reductions or GHG removal enhancements
relative to the project baseline using the data check conducted pursuant to
section 95977.1(b)(3)(L),
and must determine whether there is reasonable assurance that the Offset
Project Data Report does not contain an offset material misstatement for the
Offset Project Operator or Authorized Project Designee, on a
CO2e basis. To assess conformance with this article and
the Compliance Offset Protocol the offset verification team must review the
methods and factors used to develop the Offset Project Data Report for
adherence to the requirements of this article and the Compliance Offset
Protocol and ensure that other requirements of this article are met.
(O) Issues Log. The offset verification team
must keep a log of any issues identified in the course of offset verification
services that may affect determinations of offset material misstatement and
nonconformance. The issues log must identify the section of this article or
Compliance Offset Protocol related to the nonconformance, if applicable, and
indicate that the issues were corrected by the Offset Project Operator or
Authorized Project Designee prior to completing the offset verification
services. Any other concerns that the offset verification team has with the
preparation of the Offset Project Data Report must be documented in the issues
log. The issues log must indicate whether the issues could have any bearing on
offset material misstatement or conformance.
(P) An assessment of offset material
misstatement is conducted for net GHG reductions and GHG removal enhancements
achieved in a given Reporting Period relative to the project baseline in that
Reporting Period in metric tons of CO2e.
(Q) The offset verification team must
determine whether the GHG reductions and GHG removal enhancements quantified
and reported in the Offset Project Data Report contain an offset material
misstatement using the following equation:
Click
here to view image
Where:
"Discrepancies" means any differences between the
reported GHG value for sources, sinks, and reservoirs for the project baseline
or project, and the verifier calculated GHG value for a data source subject to
data checks in 95977.1(b)(3)(L) calculated by the offset verification team. Any
discrepancies identified must include the positive or negative impact of the
GHG source, sink, or reservoir on the total reported GHG emission reductions
and removal enhancements when input into the offset material misstatement
equation.
"Omissions" means any GHG emissions or removal
enhancements associated with required sources, sinks, and reservoirs for the
project baseline or project emissions, that the offset verification team
concludes must be part of the Offset Project Data Report, but were not included
by the Offset Project Operator or Authorized Project Designee in the Offset
Project Data Report. Any omissions found by the offset verification team must
include the positive or negative impact of the omission on the total reported
GHG emission reductions and removal enhancements when input into the offset
material misstatement equation.
"Misreporting" means duplicative, incomplete, or other
GHG emissions or removal enhancements for required sources, sinks, and
reservoirs in the project baseline or project emissions, the offset
verification team concludes should, or should not, be part of the Offset
Project Data Report. Any misreporting found by the offset verification team
must include the positive or negative impact of the misreporting on the total
reported GHG emission reductions and removal enhancements when input into the
offset material misstatement equation.
"Total reported emission reductions and removal
enhancements" means net GHG reductions and GHG removal enhancements reported by
the Offset Project Operator or Authorized Project Designee for an Offset
Project Data Report relative to the project baseline for that Offset Project
Data Report in metric tons CO2e.
(R) Offset verification services are not
complete until ARB offset credits are issued for the GHG emission reductions
and GHG removal enhancements reported in an Offset Project Data Report. Offset
verification services must include:
1. Offset
Verification Statement. Prior to completion of the offset verification services
conducted pursuant to section
95977.1(b)(3),
the verification body must complete an Offset Verification Statement for each
Offset Project Data Report for which offset verification services were
conducted and provide it to the Offset Project Operator or Authorized Project
Designee and ARB or the Offset Project Registry by the verification deadline
pursuant to section
95977(d). Before
the Offset Verification Statement is completed, the verification body must have
the offset verification services and findings of the offset verification team
independently reviewed within the verification body by an independent reviewer
not involved in offset verification services for that offset project. The
independent reviewer may not be the offset project specific verifier, and may
not accompany the offset verification team on a site visit. The independent
reviewer may conduct a separate site visit, if necessary.
2. The independent reviewer shall serve as
the final check of the offset verification team's work to identify any
significant concerns, including:
a. Errors in
planning;
b. Errors in data
sampling; and
c. Errors in judgment
by the offset verification team that are related to the draft offset
verification statement.
3. The independent reviewer must maintain
independence from the offset verification services by not making specific
recommendations about how the offset verification services should be conducted.
The independent reviewer will review documents applicable to the offset
verification services provided and identify any failure to comply with the
requirements of this article or with the verification body's internal policies
and procedures for providing offset verification services. The independent
reviewer must concur with the offset verification findings before the Offset
Verification Statement can be issued.
4. When the offset verification team
completes its findings:
a. The verification
body must provide to the Offset Project Operator or Authorized Project Designee
a detailed verification report for each Offset Project Data Report for which
offset verification services were conducted. The detailed verification report
must at a minimum include the Offset Verification Plan, the detailed comparison
of the data checks conducted during offset verification services pursuant to
section 95977.1(b)(3)(L),
including the required narrative, the issues log identified in the course of
offset verification activities and the issue resolutions, and any qualifying
comments on findings during offset verification services. The detailed
verification report must also include the calculations performed in
95977.1(b)(3)(Q) with enough detail to understand the relationships between the
data checks and the offset material misstatement evaluation, and be made
available to ARB within 10 calendar days upon request. If the Offset
Verification Statement is being submitted to an Offset Project Registry, then
the verification body must submit the detailed verification report to the
Offset Project Registry with the Offset Verification Statement. The detailed
verification report must be submitted to the Offset Project Operator or
Authorized Project Designee at the same time or before the Offset Verification
Statement is submitted to ARB or the Offset Project Registry.
b. The verification body must provide the
Offset Verification Statement to the Offset Project Operator or Authorized
Project Designee and ARB or the Offset Project Registry, attesting to ARB
whether the verification body has found the submitted Offset Project Data
Report to be free of offset material misstatement, and whether the Offset
Project Data Report is in conformance with the requirements of this article and
the Compliance Offset Protocol.
c.
A Compliance Offset Protocol may restrict the use of a Qualified Positive
Offset Verification Statement for certain project types, in which case the
verification body must submit either a Positive Offset Verification Statement
or an Adverse Offset Verification Statement. In the case of a Qualified
Positive Offset Verification Statement, when not restricted by a Compliance
Offset Protocol, the verification body will qualify the Offset Verification
Statement to indicate any nonconformances allowed for a qualified Positive
Offset Verification Statement as defined in section
95802 contained within the Offset
Project Data Report and that these nonconformances do not result in an offset
material misstatement.
d. The
offset verification team must have a final discussion with the Offset Project
Operator or Authorized Project Designee explaining their findings and notifying
the Offset Project Operator or Authorized Project Designee of any unresolved
issues noted in the issues log before the Offset Verification Statement is
finalized and submitted to the Offset Project Registry or ARB.
e. The lead verifier in the offset
verification team must attest to ARB in the Offset Verification Statement that
the offset verification team has carried out all offset verification services
as required by this article, and the lead verifier who has conducted the
independent review of offset verification services and findings must attest to
his or her independent review on behalf of the verification body and his or her
concurrence with the offset verification findings.
f. The lead verifier must attest in the
Offset Verification Statement, in writing, to ARB as follows:
"I certify under penalty of perjury under the laws of
the State of California that the offset verification team has carried out all
offset verification services as required by sections
95977.1,
95977.2, and the applicable
Compliance Offset Protocol and the findings are true, accurate, and complete
and have been independently reviewed by an independent reviewer as required
under sections
95977.1(b)(3)(R)
(1.) through 95977.1(b)(3)(R)(3.)."
5. Prior to the verification body providing
an Adverse Offset Verification Statement to ARB or the Offset Project Registry,
the Offset Project Operator or Authorized Project Designee must be provided at
least 10 working days to modify the Offset Project Data Report to correct any
offset material misstatement or nonconformance found by the offset verification
team. The modified Offset Project Data Report and Offset Verification Statement
must be submitted to ARB or the Offset Project Registry by the applicable
verification deadline, unless the Offset Project Operator or Authorized Project
Designee makes a request to ARB pursuant to section
95977.1(b)(3)(R)6.
6. If the Offset Project Operator or
Authorized Project Designee and the verification body cannot reach agreement on
modifications to the Offset Project Data Report that result in a Positive
Offset or Qualified Positive Offset Verification Statement due to a
disagreement on the requirements of this article or Compliance Offset Protocol,
the Offset Project Operator or Authorized Project Designee may petition ARB to
make a decision as to the verifiability of the submitted Offset Project Data
Report.
7. If ARB determines that
the Offset Project Data Report does not meet the standards and requirements
specified in this article, the Offset Project Operator or Authorized Project
Designee must provide any additional information within 30 calendar days of the
ARB determination. ARB will review the new information and notify the Offset
Project Operator or Authorized Project Designee and verification body of its
final decision. In re-verifying a revised Offset Project Data Report, the
verification body and offset verification team shall be subject to the
requirements in sections
95977.1(b)(3)(R)1.
through 95977.1(b)(3)(R)4. and must submit the revised Offset Verification
Statement to ARB or the Offset Project Registry within 15 calendar
days.
8. If ARB or the Offset
Project Registry determines that the detailed verification report required
pursuant to 95977.1(b)(3)(R)4.a. does not contain sufficient information to
substantiate the attestations in the Offset Verification Statement, then the
verification body must submit a revised verification report and a revised
Offset Verification Statement to ARB or the Offset Project Registry within 15
calendar days of the determination.
(S) Upon submission of the Offset
Verification Statement to ARB or the Offset Project Registry, the Offset
Project Data Report must be considered final and no further changes may be made
by the Offset Project Operator or Authorized Project Designee unless the Offset
Project Registry or ARB requests any changes as part of their review. Once ARB
offset credits are issued for the Offset Project Data Report, all offset
verification requirements of this article shall be considered complete for the
applicable Offset Project Data Report.
(T) If the Executive Officer finds a high
level of conflict of interest existed between a verification body and an Offset
Project Operator or Authorized Project Designee pursuant to section
95979(b)(4) and
section 95979(b)(5), or
an Offset Project Data Report that received a Positive Offset or Qualified
Positive Offset Verification Statement fails an ARB audit, the Executive
Officer may set aside the Positive Offset or Qualified Positive Offset
Verification Statement submitted by the verification body and require the
Offset Project Operator or Authorized Project designee to have the Offset
Project Data Report re-verified by a different verification body within 90
calendar days of this finding.
(U)
Upon request by ARB or the Offset Project Registry, the Offset Project Operator
or Authorized Project Designee must provide the data used to generate an Offset
Project Data Report, including all data available to the offset verification
team in the conduct of offset verification services, within 10 working days of
the request.
(V) Upon request by
ARB or the Offset Project Registry the verification body must provide ARB or
the Offset Project Registry the detailed verification report given to the
Offset Project Operator or Authorized Project Designee, as well as the sampling
plan, contracts for offset verification services, and any other supporting
documentation. All documentation must be provided by the verification body to
ARB or the Offset Project Registry within 10 working days of the
request.
(W) Upon written
notification by ARB the verification body and its staff must be available for
an offset verification services audit when providing offset verification
services for an offset project listed with ARB or an Offset Project Registry
using a Compliance Offset Protocol.