California Code of Regulations
Title 14 - Natural Resources
Division 7 - Department of Resources Recycling and Recovery
Chapter 3 - Minimum Standards for Solid Waste Handling and Disposal
Article 5.9 - Construction and Demolition and Inert Debris Transfer/Processing Regulatory Requirements
Section 17383.2 - Activities at Solid Waste Facilities

Universal Citation: 14 CA Code of Regs 17383.2

Current through Register 2024 Notice Reg. No. 38, September 20, 2024

(a) C&D wood debris chipping and grinding operations and facilities and CDI debris and inert debris processing operations and facilities are not required to obtain a separate permit or meet the notification requirements of this Article if the activity is occurring at a facility that has a full solid waste facilities permit and the permit authorizes the activity either through a specific condition in the permit or as a described and approved activity in a Report of Facility Information.

(b) Notwithstanding, C&D wood debris chipping and grinding activities when located at a solid waste facility which has a full solid waste facilities permit shall satisfy the requirements of sections 17383 and 17383.3 (b) through (k) except if material is used on site.

1. New section filed 7-10-2003; operative 8-9-2003 (Register 2003, No. 28).

Note: Authority cited: Sections 40502, 43020 and 43021, Public Resources Code. Reference: Sections 40053, 43020 and 43021, Public Resources Code.

Disclaimer: These regulations may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.