California Code of Regulations
Title 14 - Natural Resources
Division 2 - Department of Conservation
Chapter 8 - Mining and Geology
Subchapter 1 - State Mining and Geology Board
Article 9 - Reclamation Standards
Section 3704 - Performance Standards for Backfilling, Regrading, Slope Stability, and Recontouring

Universal Citation: 14 CA Code of Regs 3704

Current through Register 2024 Notice Reg. No. 38, September 20, 2024

Backfilling, regrading, slope stabilization, and recontouring shall conform with the following standards:

(a) Where backfilling is proposed for urban uses (e.g., roads, building sites, or other improvements sensitive to settlement), the fill material shall be compacted in accordance with the Uniform Building Code, published by the International Conference of Building Officials and as adopted by the lead agency, the local grading ordinance, or other methods approved by the lead agency as appropriate for the approved end use.

(b) Where backfilling is required for resource conservation purposes (e.g., agriculture, fish and wildlife habitat, and wildland conservation), fill material shall be backfilled to the standards required for the resource conservation use involved.

(c) Piles or dumps of mining waste shall be stockpiled in such a manner as to facilitate phased reclamation. They shall be segregated from topsoil and topsoil substitutes or growth media salvaged for use in reclamation.

(d) Final reclaimed fill slopes, including permanent piles or dumps of mine waste rock and overburden, shall not exceed 2:1 (horizontal:vertical), except when site-specific geologic and engineering analysis demonstrate that the proposed final slope will have a minimum slope stability factor of safety that is suitable for the proposed end use, and when the proposed final slope can be successfully revegetated.

(e) At closure, all fill slopes, including permanent piles or dumps of mine waste and overburden, shall conform with the surrounding topography and/or approved end use.

(f) Cut slopes, including final highwalls and quarry faces, shall have a minimum slope stability factor of safety that is suitable for the proposed end use and conform with the surrounding topography and/or approved end use.

(g) Permanent placement of piles or dumps of mining waste and overburden shall not occur within wetlands unless mitigation acceptable to the regulatory agencies with jurisdiction over wetlands, which may include the lead agency, has been proposed to offset wetland impacts and/or losses.

1. New section filed 12-16-92; operative 1-15-93 (Register 92, No. 51).
2. Amendment of subsections (a) and (g) filed 10-31-2000; operative 11-30-2000 (Register 2000, No. 44).

Note: Authority cited: Sections 2755, 2756 and 2773, Public Resources Code. Reference: Section 2773, Public Resources Code.

Disclaimer: These regulations may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.