Section 1935.4 - Production Casing

Universal Citation: 14 CA Code of Regs 1935.4
Current through Register 2024 Notice Reg. No. 38, September 20, 2024

Production casing may be set above or through the producing or injection zone and cemented above the objective zones. Sufficient cement shall be used to exclude overlying formation fluids from the zone, to segregate zones, and to prevent movement of fluids behind the casing into zones that contain usable groundwater. Production casing shall either be cemented with sufficient cement to fill the annular space from the shoe to the surface or lapped into intermediate casing, if run. Production casing lapped into an intermediate string, shall overlap at least 15 meters (about 50 feet); the lap shall be cemented solidly; and shall be pressure tested to ensure its integrity.

1. Amendment filed 8-16-79; effective thirtieth day thereafter (Register 79, No. 33).

Note: Authority cited: Section 3714, Public Resources Code. Reference: Sections 3739 and 3740, Public Resources Code.

Disclaimer: These regulations may not be the most recent version. California may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.