California Code of Regulations
Title 14 - Natural Resources
Division 2 - Department of Conservation
Chapter 4 - Development, Regulation, and Conservation of Oil and Gas Resources
Subchapter 1 - Onshore Well Regulations
Article 4 - Underground Injection Control
Section 1724.10.4 - Continuous Pressure Monitoring
Current through Register 2024 Notice Reg. No. 38, September 20, 2024
(a) Operators shall comply with the following requirements for well-specific injection pressure monitoring:
(b) Operators are not required to comply with subdivision (a) until April 1, 2021. Until an operator has complied with subdivision (a), the operator shall ensure that an accurate, operating pressure gauge or pressure recording device shall be available at all times, and all injection wells shall be equipped for installation and operation of such gauge or device. Gauges shall be regularly calibrated in accordance the with manufacturer's recommendations. Evidence of such calibration shall be available to the Division upon request.
1. New section filed 2-6-2019; operative 4-1-2019 (Register 2019, No. 6).
Note: Authority cited: Sections 3013 and 3106, Public Resources Code. Reference: Section 3106, Public Resources Code.