Current through Register 2024 Notice Reg. No. 38, September 20, 2024
(a) When an engine
manufacturer delivers a certified engine package under this article to a SPMV
manufacturer, the certified engine package must be complete, including all
components of the certified engine package.
(b) The following written materials must also
accompany the certified engine package:
(1)
The engine manufacturer must furnish with each certified engine package written
instructions for the required maintenance and use of the certified engine
package by the ultimate purchaser, and the written instructions shall be
consistent with this section.
(A) The engine
manufacturer must include fuel tank specifications, e.g., tank material,
maximum capacity and vapor volume, minimum distance from the engine, gas cap
seals, filler neck, pressure/vacuum relief settings, etc. in the installation
manual to ensure that the SPMV will comply with the evaporative emission
standard. Additionally, the nozzle access zone and the filler neck area,
including the filler neck face, shall be free of sharp projections or edges
which could foreseeably damage the bellows and faceplates of fuel vapor
recovery nozzles during fueling activity.
(B) The engine manufacturer must submit the
above instructions with the engine manufacturer's application for each
certified engine package for approval by the Executive Officer.
(C) The engine manufacturer must include
instructions that the certified engine package should be installed in the
vehicle to ensure a Smog Check inspection may be performed.
(D) The Executive Officer may reject or
require modification of written instructions for, among other reasons,
incompleteness or lack of clarity. Approval by the Executive Officer of the
written instructions shall be a condition of certification.
(2) A statement that the certified engine
package, exhaust ECS, and evaporative ECS must be installed in a SPMV with an
N/V ratio less than the N/V ratio of the worst case vehicle and below the
weight of the worst case vehicle. The statement must specify the N/V ratio and
weight limits not to be exceeded. This statement may be included in the written
instructions, in paragraph (1) above.
(3) A statement that no changes may be made
to the certified engine package and evaporative ECS, including, but not limited
to: changes to the fuel metering system; changes to the ignition system,
changes to the camshaft; and modifying, recalibrating, removing, or failing to
properly install any other specified component. This statement may be included
in the written instructions, in paragraph (1) above.
(4) A statement that failure to meet the
requirements of paragraphs (1) through (3) above will cause the SPMV to violate
CARB's certification requirements which may subject the SPMV manufacturer to
penalties. This statement may be included in the written instructions, in
paragraph (1) above.
(5) A label
that meets the requirements of section
2209.5, title 13, CCR, and an
explanation of where and how the label is to be permanently attached on the
SPMV.
(6) An engine owner's manual
that is to be provided to the ultimate purchaser. The owner's manual provided
by the engine manufacturer must contain maintenance instructions. The owner's
manual must contain a statement that disconnecting, modifying, or altering any
emission control system on a certified engine package constitutes illegal
tampering that is prohibited by state law.
(7) A notice, printed on a separate sheet of
paper, explaining the documentation, record keeping, notification, and access
to records requirements for SPMV manufacturers installing certified engine
package in the state of California.
(8) An affidavit, which must be completed by
the SPMV manufacturer indicating that all of the above-described requirements
for the proper installation of the certified engine package and the record
keeping and notification requirements have been read and understood. Provide a
mailing address for the affidavit to be sent.
(9) A warranty card requesting the SPMV make
and model, the serial number of the certified engine package installed, vehicle
identification number, the date of installation, and the SPMV manufacturer's
name (and company as applicable). Provide a mailing address for the warranty
card to be sent.
1. New
section filed 8-5-2019; operative 10-1-2019 (Register 2019, No.
32).
2. Editorial correction adding NOTE (Register 2019, No.
36).
Note: Authority cited: Sections 39600, 39601, 43000,
43100, 43101, 43102, 43104 and 43105, Health and Safety Code. Reference:
Sections 39002, 39003, 43000, 43100, 43101, 43102, 43104, 43105, 43106 and
43205, Health and Safety Code; and Section 580, Vehicle
Code.