Arkansas Administrative Code
Agency 178 - Arkansas Oil and Gas Commission
Rule 178.00.06-012 - B-23 - Tubing
Universal Citation: AR Admin Rules 178.00.06-012
Current through Register Vol. 49, No. 9, September, 2024
RULE B-23 TUBING
a) All oil wells shall be equipped with, and produced through tubing. Bottom of tubing on flowing wells shall not be higher than top of producing interval. If tubing is perforated, the perforations shall not extend above the top of the producing interval.
b) All dry gas wells are not required to produce through tubing, provided surface casing has been set in the well in accordance with applicable rules. If multiple gas zones are produced in the well, authority to commingle in accordance with General Rule D-18 shall be required.
Disclaimer: These regulations may not be the most recent version. Arkansas may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.