Arizona Administrative Code
Title 18 - ENVIRONMENTAL QUALITY
Chapter 9 - DEPARTMENT OF ENVIRONMENTAL QUALITY - WATER POLLUTION CONTROL
Article 3 - AQUIFER PROTECTION PERMITS - GENERAL PERMITS
Part A - GENERAL PROVISIONS
Section R18-9-A304 - Notice of Transfer
Universal Citation: AZ Admin Code R 18-9-A304
Current through Register Vol. 30, No. 38, September 20, 2024
A. Transfer of authorization under a Type 1 General Permit.
1. A permittee transferring ownership of a
facility covered by a Type 1.01 through 1.08, or 1.10 through 1.12 General
Permit is not required to notify the Department of the transfer.
2. A permittee transferring ownership of an
on-site wastewater treatment facility operating under a Type 1.09 General
Permit shall follow the requirements under
R18-9-A316.
3. A permittee transferring ownership of a
sewage treatment facility operating under a Type 1.09 General Permit shall
submit a Notice of Transfer to the Department by certified mail within 15 days
after the date that ownership changes.
B. Transfer of authorization under a Type 2, 3, or 4.01 General Permit.
1. If a change of
ownership occurs for a facility covered by a Type 2, 3, or 4.01 General Permit
facility, the permittee shall provide a Notice of Transfer to the Department or
to the health or environmental agency delegated by the Director to administer
Type 4.01 General Permits, by certified mail within 15 days after the date that
ownership changes. The Notice of Transfer, on a form approved by the
Department, shall include:
a. Any information
that has changed from the original Notice of Intent to Discharge,
b. Any other transfer requirements specified
for the general permit, and
c. The
applicable fee established in 18 A.A.C. 14.
2. The Department may require a permittee
covered by a Type 2, 3, or Type 4.01 General Permit to submit a new Notice of
Intent to Discharge and to obtain a new authorization under
R18-9-A301(A)(2),
(3) and (4), as applicable, if the volume or
characteristics of the discharge have changed from the original
application.
C. Transfer of a Type 4.02 through 4.23 General Permit. A permittee transferring ownership of an on-site wastewater treatment facility operating under one or more Type 4.02 through 4.23 General Permits shall follow the requirements under R18-9-A316.
Disclaimer: These regulations may not be the most recent version. Arizona may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.