Section R18-9-A304 - Notice of Transfer

Universal Citation: AZ Admin Code R 18-9-A304

Current through Register Vol. 30, No. 38, September 20, 2024

A. Transfer of authorization under a Type 1 General Permit.

1. A permittee transferring ownership of a facility covered by a Type 1.01 through 1.08, or 1.10 through 1.12 General Permit is not required to notify the Department of the transfer.

2. A permittee transferring ownership of an on-site wastewater treatment facility operating under a Type 1.09 General Permit shall follow the requirements under R18-9-A316.

3. A permittee transferring ownership of a sewage treatment facility operating under a Type 1.09 General Permit shall submit a Notice of Transfer to the Department by certified mail within 15 days after the date that ownership changes.

B. Transfer of authorization under a Type 2, 3, or 4.01 General Permit.

1. If a change of ownership occurs for a facility covered by a Type 2, 3, or 4.01 General Permit facility, the permittee shall provide a Notice of Transfer to the Department or to the health or environmental agency delegated by the Director to administer Type 4.01 General Permits, by certified mail within 15 days after the date that ownership changes. The Notice of Transfer, on a form approved by the Department, shall include:
a. Any information that has changed from the original Notice of Intent to Discharge,

b. Any other transfer requirements specified for the general permit, and

c. The applicable fee established in 18 A.A.C. 14.

2. The Department may require a permittee covered by a Type 2, 3, or Type 4.01 General Permit to submit a new Notice of Intent to Discharge and to obtain a new authorization under R18-9-A301(A)(2), (3) and (4), as applicable, if the volume or characteristics of the discharge have changed from the original application.

C. Transfer of a Type 4.02 through 4.23 General Permit. A permittee transferring ownership of an on-site wastewater treatment facility operating under one or more Type 4.02 through 4.23 General Permits shall follow the requirements under R18-9-A316.

Disclaimer: These regulations may not be the most recent version. Arizona may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.