Section R14-2-2624 - Disconnect Switch Requirements

Universal Citation: AZ Admin Code R 14-2-2624

Current through Register Vol. 30, No. 38, September 20, 2024

A. If required by a Utility, a Customer shall install and maintain a visual-open, manually operated, load break Disconnect Switch that completely opens and isolates all ungrounded conductors of the Generating Facility from the Distribution System. For multi-phase systems, the Disconnect Switch shall be gang-operated.

B. A Utility may impose additional requirements for a Disconnect Switch in its Interconnection Manual.

Disclaimer: These regulations may not be the most recent version. Arizona may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.