Arizona Administrative Code
Title 12 - NATURAL RESOURCES
Chapter 7 - OIL AND GAS CONSERVATION COMMISSION
Article 1 - OIL, GAS, HELIUM, AND GEOTHERMAL RESOURCES
Section R12-7-136 - Subsurface Pressure Tests and Reservoir Surveys

Universal Citation: AZ Admin Code R 12-7-136

Current through Register Vol. 30, No. 38, September 20, 2024

A. Each operator shall conduct a test, within 30 days after completion, to determine the reservoir pressure on the discovery well of any new pool. The test shall be made after the well has been shut-in for at least 24 hours, and the results shall be reported in writing to the Commission within 15 days after the completion of the test.

B. The Commission may require subsurface pressure measurements on a number of wells in any pool to provide data to determine reservoir characteristics. The survey shall be made by the operator and shall provide a description of the test method and results including fluids, temperature, and pressure data and may require supervision by a qualified agent of the Commission. The results shall be reported in writing to the Commission within 15 days of the completion of the survey.

Disclaimer: These regulations may not be the most recent version. Arizona may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.