Alaska Administrative Code
Title 8 - Labor and Workforce Development
Part 4 - Occupational Safety and Health Division
Chapter 80 - Boiler and Pressure Vessel Construction Code
Article 1 - Boiler and Pressure Vessel Construction Code
8 AAC 80.015 - Notification of installation

Universal Citation: 8 AK Admin Code 80.015

Current through February 27, 2024

(a) A contractor or subcontractor who installs boilers or pressure vessels subject to state law must notify the department of any installation within 30 days of the installation. This notification may be on the departmental preaddressed and preprinted form, or in the form of a letter; however, the notification must contain the following information:

(1) date of installation;

(2) name of the owner;

(3) address of the owner;

(4) address of the installation;

(5) specific location of the boiler or vessel;

(6) telephone contact number for the installer;

(7) type of boiler or unfired vessel;

(8) manufacturer's serial number or the National Board number;

(9) British thermal unit input of the boiler or cubic foot volume of pressure vessel;

(10) contractor's name and signature; and

(11) contractor license number.

(b) The information shall be added to the department's data base for boilers and pressure vessels. The information shall appear on the inspector's overdue list until such time as the vessel is certified for service.

Authority:AS 18.60.180

AS 18.60.340

Disclaimer: These regulations may not be the most recent version. Alaska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.