20 AAC 25.450 - Underground injection control variances

Universal Citation: 20 AK Admin Code 20 AAC 25.450

Current through February 27, 2024

(a) If injection does not occur into, through, or above freshwater, the commission will, authorize requirements for a well or project that are less stringent than the requirements in this chapter for the radius of investigation established under 20 AAC 25.252(h) or 20 AAC 25.402(b), casing and cementing, the tubing and packer mechanical integrity, operation, monitoring, and reporting, to the extent that the commission determines that the reduction in requirements will not result in an increased risk of movement of fluids into freshwater.

(b) At the discretion of the commission, pilot projects for enhanced recovery using a technology not proved feasible under the conditions in which it is being tested may be operated with less stringent requirements for well construction, operation, monitoring, and reporting, if the project will not result in an increased risk of fluid movement into freshwater sources.

Authority:AS 31.05.030

Disclaimer: These regulations may not be the most recent version. Alaska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.