18 AAC 72.650 - Notification and documentation requirements
Current through November 28, 2024
(a) A registered engineer who plans to install a system under 18 AAC 72.611(a) shall notify the department at least one day before beginning construction or modification of the alternative onsite wastewater system. The notification must include
(b) If a registered engineer is unable to
(c) Not later than 90 days after completing the installation or modification of an alternative wastewater system under 18 AAC 72.611(a), the registered engineer responsible for construction of the system shall submit to the department a completed registration package that includes
(d) The department may conduct an inspection of an installation, modification, or operation. If the department conducts an inspection of an alternative wastewater system due to a complaint, an inspection fee may be charged in accordance with 18 AAC 72.945.