Alaska Administrative Code
Title 17 - Transportation and Public Facilities
Chapter 90 - Division of Measurement Standards
Article 3 - Electric Meters
17 AAC 90.500 - Frequency of testing
Universal Citation: 17 AK Admin Code 17 AAC 90.500
Current through August 30, 2024
(a) An electric meter or accessory, other than an instrument transformer, must be tested by the owner or operator before installation and must be retested upon the request of
(1) a consumer receiving service through the
meter, as provided in
AS
42.05.351; or
(2) the division.
(b) In addition to the retest requirements in (a) of this section, the owner or operator of an electric meter must retest the meter if the
(1) meter is removed from service
for any reason; or
(2) division
requires retesting because selective testing indicates that a particular type
or age group of meters may be inaccurate.
Authority:AS 45.75.040
AS 45.75.050
AS 45.75.070
AS 45.75.080
Disclaimer: These regulations may not be the most recent version. Alaska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.