17 AAC 15.251 - Installation and inspection

Universal Citation: 17 AK Admin Code 17 AAC 15.251

Current through August 30, 2024

(a) Each permittee shall give the department written notice not less than 10 days before the start of construction on any utility facility.

(b) A copy of the permit must be at the work site during construction and installation operations and must be shown, upon request, to any department representative, Alaska state trooper, or other enforcement officer of the state.

(c) The department will, in its discretion, require inspection of the facility during construction and installation operations. The inspection must be sufficient to ensure full compliance with the provisions of the permit.

Authority:AS 02.15.020

AS 02.15.102

AS 02.15.106

AS 19.05.020

AS 19.05.040

AS 19.25.200

AS 19.30.051

AS 19.30.121

AS 19.40.065

AS 35.05.020

AS 35.10.210

AS 35.10.230

Disclaimer: These regulations may not be the most recent version. Alaska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.