Alaska Administrative Code
Title 17 - Transportation and Public Facilities
Chapter 15 - Utility and Railroad Permits
Article 1 - Utility Permits
17 AAC 15.031 - Application for utility permit on section-line rights-of-way
Current through August 30, 2024
(a) Utility permits are required only for section-line rights-of-way presently used or proposed for use by the department. A person seeking to install a utility facility within a section-line right-of-way shall check with the department to determine whether the department presently uses or proposes to use the affected portion of the section-line right-of-way.
(b) Before issuing a permit for the installation of a utility facility within a section-line right-of-way, the department must be satisfied that a section-line right-of-way exists at the location where the facility is proposed to be installed by the permit applicant. The permit applicant shall furnish proof of the existence of the section-line right-of-way.
(c) An applicant that is granted a permit for the installation of a utility facility within a department section-line right-of-way shall coordinate the installation of the facility with any proposed department project using the section-line right-of-way.
(d) The permittee shall provide one copy of each permit for the installation of any utility facility within a department-controlled section-line right-of-way to the Department of Natural Resources.
(e) The department will immediately submit written notice to the Department of Natural Resources if a section-line permit application is denied.
Authority:AS 19.05.020
AS 19.05.040
AS 19.25.010
AS 19.25.200
AS 19.30.051
AS 19.30.121
AS 19.40.065