11 AAC 95.340 - Harvest unit planning and design

Universal Citation: 11 AK Admin Code 95.340

Current through August 30, 2024

(a) A logging system must be appropriate for the terrain, soils, and timber type so that yarding or skidding can be accomplished in compliance with AS 41.17 and this chapter.

(b) A harvest unit must be designed so that felling, bucking, yarding, skidding, and reforestation can be accomplished in compliance with AS 41.17 and this chapter.

(c) On state and municipal forest land, an operator conducting timber harvest, road construction, or a related activity shall, where feasible, retain a buffer of not less than 330 feet in radius around each bald eagle nesting tree.

(d) On unstable slopes, an operator shall consider one or more of the following:

(1) partial cuts;

(2) retention areas;

(3) use of helicopter or skyline systems to achieve full suspension of logs;

(4) other techniques to minimize disturbance to soils, understory vegetation, stumps, and root systems.

Authority:AS 41.17.010

AS 41.17.055

AS 41.17.080

Disclaimer: These regulations may not be the most recent version. Alaska may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.