(1) Hoist Capacity - All hoisting equipment used in shafts and slopes shall be of ample capacity and of standard design commercially recognized as safe, for its particular duty.
(2) Hoist Brakes - All such hoists shall have sufficient power to hoist the unloaded unbalanced cage or skip and shall be equipped with brakes adequate to stop and hold the fully loaded unbalanced cage or skip, (or trip of cars), at any point in the shaft or slope.
(3) Safety Devices on Hoists - All electrical hoists used for handling mantrips in vertical shafts shall be equipped with protective devices which will promptly bring the hoist to rest upon failure of power and will permit the lowering of the cage, skip or cars by brakes after it has been brought to rest through failure of power.
Author: Marcus Davis, Workers' Compensation Examiner.