General Requirements
- Section 420-3-1-.05 - Requirements For An OSS/EDS
- Section 420-3-1-.06 - Permits Required For An OSS/EDS
- Section 420-3-1-.07 - Proprietary And Non-Proprietary Products
- Section 420-3-1-.08 - OSS/EDS Installation
- Section 420-3-1-.09 - Engineer Design Required
- Section 420-3-1-.10 - Minimum Lot Size Requirements
- Section 420-3-1-.11 - Easements Required
- Section 420-3-1-.12 - Requirements For All Permit Applications
- Section 420-3-1-.13 - Time Limitations And Permitting Actions
- Section 420-3-1-.14 - Requirements And Exceptions To Large-Flow Developments
- Section 420-3-1-.15 - Requirements For Performance Permits
- Section 420-3-1-.16 - Wastewater Management Entities
Disclaimer: These regulations may not be the most recent version. Alabama may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.