Alabama Administrative Code
Title 400 - STATE OIL AND GAS BOARD OF ALABAMA
GOVERNING COALBED METHANE GAS OPERATIONS
Chapter 400-3-5 - TESTING AND ALLOWABLE
Section 400-3-5-.02 - Swabbing And Cleaning Wells
Flow tests of less than twenty-four (24) hours, including swabbing and cleaning a well, shall not be considered as a production test. A record of the daily operation of well cleaning shall be reported on the reverse side of Form OGB-9, First Production or Retest Report, giving pressure data and the volumes of water, fracture fluid, oil or condensate, and gas recovered. Unless otherwise approved by the Supervisor, all wells shall be cleaned into a tank prior to production. The tank shall be of sufficient size to contain all fluids.
Author: State Oil and Gas Board
See history note at end of chapter.
Statutory Authority: Code of Ala. 1975, §§ 9-17-1, et seq.