Results 101 - 150 of 43,568
Sorted by Date | Sort by Relevance
Nevada Irrigation District; Notice of Application for Non-Capacity Amendment of License Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests
. Date Filed: October 9, 2024.
d. Applicant: Nevada Irrigation District.
e. Name of Project: Scotts Flat Power Project.
f. Location: The project is located on Deer Creek near Nevada City
in Nevada County, California. The project does
Commonwealth Edison Company; Notice of Institution of Section 206 Proceeding and Refund Effective Date
, in
accordance with Rule 214 of the Commission's Rules of Practice and
Procedure, 18 CFR 385.214 (2024), within 21 days of the date of
issuance of the order.
In addition to publishing the full text of this document in the
Federal Register, the Commission
Qualifying Facility Rates and Requirements Implementation Issues Under the Public Utility Regulatory Policies Act of 1978; Notice of Second Revised Procedural Schedule for the Environmental Assessment for Qualifying Facility Rates and Requirements Implementation Issues Under the Public Utility Regulatory Policies Act of 1978
FERC ]
61,158 (2020), aff'd in part and remanded in part sub nom. Solar
Energy Indus. Ass'n v. FERC, 80 F.4th 956 (9th Cir. 2023) (Solar
Energy).
\2\ 16 U.S.C. 796(17)-(18), 824a-3.
\3\ 42 U.S.C. 4321 et seq.; see also 18 CFR pt. 380 (2024
Safety Zone; Francis Scott Key Bridge, Patapsco River, Baltimore, MD
Guard that it will be conducting demolition and construction activities
on the Patapsco River at the site of the Francis Scott Key Bridge,
which was hit by a container ship on March 26, 2024, see 89 FR 24385
(April 8, 2024). Debris removal
Government-Owned Inventions; Availability for Licensing
.
Relevant Publications: Hawman DW, et al. A replicating RNA vaccine
confers protection in a rhesus macaque model of Crimean-Congo
hemorrhagic fever. NPJ Vaccines 2024;9:86. https://doi.org/10.1038/s41541-024-00887-z.
Inventors: Daniel Douek, David
Increase in Maximum Tuition and Fee Amounts Payable Under the Post-9/11 GI Bill
determined under 38 U.S.C. 3015(h). The most recent
percentage increase determined under 38 U.S.C. 3015(h) is 3.4%, which
was effective on October 1, 2024.
The maximum tuition and fee payments and entitlement charge amounts
for training pursued under
Revision of National Environmental Policy Act Implementing Procedures
). In 2024, DOE added a new categorical exclusion for
certain energy storage systems and revised categorical exclusions for
upgrading and rebuilding powerlines and for solar photovoltaic systems
(89 FR 34074).
C. Changes Made in This Interim Final Rule
Procedures for Considering Environmental Impacts
as a supplement to CEQ's NEPA
regulations, DOT had been awaiting CEQ action before revising its
procedures, consistent with CEQ direction. See 40 CFR 1507.3(b) (2024);
see also 86 FR 34154 (June 29, 2021). However, with CEQ's regulations
now rescinded
Notice of Rescission of FAA Order 1050.1F, Availability of FAA Order 1050.1G, Request for Comments
regulations, the FAA had been awaiting CEQ action before revising
its regulations, consistent with CEQ direction. See 40 CFR 1507.3(b)
(2024); see also 86 FR 34154 (June 29, 2021). However, with CEQ's
regulations now rescinded, and with the FAA's NEPA
Procedures for Implementing NEPA; Processing of Department of the Army Permits
revising its regulations, consistent with
[[Page 29466]]
CEQ direction. See 40 CFR 1507.3(b) (2024); see also 86 FR 34154 (June
29, 2021). However, with CEQ's regulations now rescinded, and with the
Corps' NEPA implementing procedures still unmodified
Procedures for Implementing NEPA; Removal
's NEPA regulations, the Corps had been awaiting CEQ action before
revising its regulations, consistent with CEQ direction. See 40 CFR
1507.3(b) (2024); see also 86 FR 34154 (June 29, 2021). However, with
CEQ's regulations now rescinded
National Environmental Policy Act
regulations, consistent with CEQ direction. See 40
CFR 1507.3(b) (2024); see also 86 FR 34154 (June 29, 2021). However,
with CEQ's regulations now rescinded, and with USDA's NEPA implementing
procedures still unmodified more than two years after
Environmental Analysis of Army Actions (AR 200-2)
[[Page 29451]]
been awaiting CEQ action before revising its regulations, consistent
with CEQ direction. See 40 CFR 1507.3(b) (2024); see also 86 FR 34154
(June 29, 2021). However, with CEQ's regulations now rescinded, and
with the Army's NEPA
Amendment to Environment Regulation
procedures, consistent
with CEQ direction. See 40 CFR 1507.3(b) (2024); see also 86 FR 34154
(June 29, 2021). However, with CEQ's regulations now rescinded, and
with EDA's NEPA implementing procedures still unmodified more than two
years after
Recission of Procedures for Implementing the National Environmental Policy Act (NEPA)
of these significant legislative changes. Since the DON's
regulations were originally designed as a supplement to CEQ's NEPA
regulations, the DON had been awaiting CEQ action before revising its
regulations, consistent with CEQ direction. See 40 CFR 1507.3(b)
(2024
Determination Pursuant to Section 102 of the Illegal Immigration Reform and Immigrant Responsibility Act of 1996, as Amended
to ensure the expeditious construction of barriers and roads
authorized by section 102 of IIRIRA.
Determination and Waiver
Section 1
The United States Border Patrol Rio Grande Valley Sector is an area
of high illegal entry. In fiscal year 2024
Application of the Fair Labor Standards Act to Domestic Service
] remains a reasonable, albeit brief, explanation.'' \27\
\25\ See Loper Bright Enterprises v. Raimondo, 603 U.S. 369, 386
(2024) (``[T]he contemporaneous construction of those who were
called upon to act under the law, and were appointed to carry
Recission of Final Rule: Improving Protections for Workers in Temporary Agricultural Employment in the United States
obligations applicable to employers of such nonimmigrant workers. This
notice of proposed rulemaking (NPRM or proposed rule) that would
rescind provisions contained within a final rule published by the
Department on April 29, 2024, which adopted a number
Statements of General Policy or Interpretation Not Directly Related to Regulations
in a notice-and-comment rulemaking.
\16\ See 84 FR 68736 (2019 rule revising numerous provisions);
85 FR 34970 (2020 rule revising 778.114).
\17\ See 76 FR 18832 (2011 rule revising 780.400, 780.401,
780.406, and 780.408); 89 FR 1638 (2024 rule
Critical Infrastructure Protection Reliability Standard CIP-015-1-Cyber Security-Internal Network Security Monitoring
Security Monitoring, 89 FR
79178 (Sept. 27, 2024), 188 FERC ] 61,175 (2024) (NOPR).
4. We clarify that the term CIP-networked environment does not
cover all of a responsible entity's network. The CIP-networked
environment includes traffic inside
United States v. Safran S.A., et al.; Proposed Final Judgment and Competitive Impact Statement
for the
aerospace industry and other industries, including THSAs for large
aircraft. Safran USA, Inc. is a US-based subsidiary of Safran S.A.,
headquartered in Alexandria, Virginia. In 2024, Safran had revenues of
approximately [euro]27 billion.
5. RTX
Energy Conservation Standards for Manufactured Housing
days after enforcement procedures are
finalized (i.e., the same timeline for both Tier 1 and 2 homes).
Additionally, the Joint Commenters would like DOE to begin work on
strengthening standards based on the 2024 International Energy
Conservation
Cancellation Order for Certain Pesticide Registrations and/or Amendments To Terminate Uses
.gpo.gov]
[FR Doc No: 2025-12324]
ENVIRONMENTAL PROTECTION AGENCY
[EPA-HQ-OPP-2024-0093; FRL-12575-01-OCSPP]
Cancellation Order for Certain Pesticide Registrations and/or
Amendments To Terminate Uses
AGENCY: Environmental Protection Agency (EPA
Notice of Final Federal Agency Actions on Proposed Highway in California
Overcrossing. The actions by Caltrans, and the laws under which such
actions were taken, are described in the Environmental Assessment with
Finding of No Significant Impact (EA/FONSI) for the project, approved
on September 4, 2024, and in other documents
Allocation of Assets in Single-Employer Plans; Interest Assumptions for Valuing Benefits
spreads would
be the fifth set of spreads, this rule removes the third quarter 2024
spreads. In the future, PBGC similarly plans to remove the oldest of
the spreads. Historical spreads are available on www.pbgc.gov, along
with more recent spreads
Prohibiting Illegal Discrimination in Registered Apprenticeship Programs
and Fellows of Harvard College, 600 U.S. 181 (2023) (holding that
race-conscious admissions policies violate the Equal Protection
Clause); Muldrow v. City of St. Louis, 601 U.S. _ (2024) (clarifying
the threshold for employment discrimination claims under
Self-Regulatory Organizations; NYSE Arca, Inc.; Notice of Filing of Amendment No. 1 to Proposed Rule Change To Amend NYSE Arca Rule 8.500-E and To List and Trade Shares of the Grayscale Digital Large Cap Fund LLC
.gpo.gov]
[FR Doc No: 2025-12304]
SECURITIES AND EXCHANGE COMMISSION
[Release No. 34-103345; File No. SR-NYSEARCA-2024-87]
Self-Regulatory Organizations; NYSE Arca, Inc.; Notice of Filing
of Amendment No. 1 to Proposed Rule Change To Amend NYSE Arca
Self-Regulatory Organizations; Nasdaq ISE, LLC; Notice of Designation of a Longer Period for Commission Action on Proceedings To Determine Whether To Approve or Disapprove a Proposed Rule Change, as Modified by Amendments No. 2 and 3, Regarding Position and Exercise Limits for Options on the iShares Bitcoin Trust ETF
No: 2025-12303]
SECURITIES AND EXCHANGE COMMISSION
[Release No. 34-103344; File No. SR-ISE-2024-62]
Self-Regulatory Organizations; Nasdaq ISE, LLC; Notice of
Designation of a Longer Period for Commission Action on Proceedings To
Determine Whether
Self-Regulatory Organizations; Cboe Exchange, Inc.; Notice of Filing of Amendment No. 4 and Order Instituting Proceedings To Determine Whether To Approve or Disapprove a Proposed Rule Change, as Modified by Amendment No. 4, To Amend Rules 4.3, 4.20, and 8.30, To Allow the Exchange To List and Trade Options on the VanEck Bitcoin ETF
by Amendment No. 4.\7\
\1\ 15 U.S.C. 78s(b)(1).
\2\ 17 CFR 240.19b-4.
\3\ On January 10, 2024, the Commission approved proposals by
NYSE Arca, Inc., The Nasdaq Stock Market LLC, and Cboe BZX Exchange,
Inc. to list and trade the shares of 11 spot
Agency Information Collection Activities: Comment Request
643 .............. .............. *** 45,959
* We based this figure on the average DI payments based on SSA's current FY 2025 data (https://www.ssa.gov/legislation/2024FactSheet.pdf), and survey
researchers (Occupational Employment
Deregistration Under Section 8(f) of the Investment Company Act of 1940
,
Ohio 45246.
DWS Strategic Municipal Income Trust [File No. 811-05767]
Summary: Applicant, a closed-end investment company, seeks an order
declaring that it has ceased to be an investment company. On October
17, 2024, applicant made liquidating
Airworthiness Directives; Airbus Helicopters
[www.gpo.gov]
[FR Doc No: 2025-12377]
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2025-1116; Project Identifier MCAI-2024-00708-R;
Amendment 39-23071; AD 2025-13-05]
RIN 2120-AA64
Airworthiness
Wooden Cabinets and Vanities and Components Thereof From the People's Republic of China: Notice of Court Decision Not in Harmony With the Final Determination of Countervailing Duty Investigation; Notice of Amended Final Determination; Notice of Amended Countervailing Duty Order, In Part
-00110, Slip Op. 24-83 (CIT July 22, 2024).
In its final remand redetermination, issued in November 2024, in
compliance with the CIT's order, Commerce (1) recalculated Ancientree's
subsidy rate to reflect a pro-rated benefit for Ancientree, (2
Airworthiness Directives; Airbus Helicopters
.gpo.gov]
[FR Doc No: 2025-12370]
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2025-1350; Project Identifier MCAI-2024-00510-R]
RIN 2120-AA64
Airworthiness Directives; Airbus Helicopters
AGENCY: Federal
Airworthiness Directives; Bombardier, Inc., Airplanes
.gpo.gov]
[FR Doc No: 2025-12369]
DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
14 CFR Part 39
[Docket No. FAA-2025-1351; Project Identifier MCAI-2024-00667-T]
RIN 2120-AA64
Airworthiness Directives; Bombardier, Inc., Airplanes
AGENCY
Medicare Program; End-Stage Renal Disease Prospective Payment System, Payment for Renal Dialysis Services Furnished to Individuals With Acute Kidney Injury, End-Stage Renal Disease Quality Incentive Program, and End-Stage Renal Disease Treatment Choices Model
for calendar
year (CY) 2022 (86 FR 61874), CY 2023 (87 FR 67136), CY 2024 (88 FR
76344), and CY 2025 (89 FR 89084).
Per model evaluation reports, ETC Model performance since 2021 has
continued to show that the model is not having a statistically
Information Collection: Exemptions and Continued Regulatory Authority in Agreement States and in Offshore Waters Under Section 274
.gpo.gov]
[FR Doc No: 2025-12349]
NUCLEAR REGULATORY COMMISSION
[NRC-2024-0197]
Information Collection: Exemptions and Continued Regulatory
Authority in Agreement States and in Offshore Waters Under Section 274
AGENCY: Nuclear Regulatory Commission
Medicare and Medicaid Programs; Calendar Year 2026 Home Health Prospective Payment System (HH PPS) Rate Update; Requirements for the HH Quality Reporting Program and the HH Value-Based Purchasing Expanded Model; Durable Medical Equipment, Prosthetics, Orthotics, and Supplies (DMEPOS) Competitive Bidding Program Updates; DMEPOS Accreditation Requirements; Provider Enrollment; and Other Medicare and Medicaid Policies
to require that, beginning with 2024, the separate payment for
furnishing negative pressure wound therapy (NPWT) be for just the
device and not for nursing and therapy services. Payment for nursing
and therapy services are to be included as part
Determination of Regulatory Review Period for Purposes of Patent Extension; LIVDELZI
.gpo.gov]
[FR Doc No: 2025-12345]
DEPARTMENT OF HEALTH AND HUMAN SERVICES
Food and Drug Administration
[Docket Nos. FDA-2024-E-5142; FDA-2024-E-5273; FDA-2024-E-5274; FDA-
2024-E-5275; FDA-2024-E-5276; FDA-2024-E-5277]
Determination of Regulatory Review
Determination of Regulatory Review Period for Purposes of Patent Extension; ELREXFIO; Correction
No: 2025-12343]
DEPARTMENT OF HEALTH AND HUMAN SERVICES
Food and Drug Administration
[Docket Nos. FDA-2024-E-0209 and FDA-2024-E-0210]
Determination of Regulatory Review Period for Purposes of Patent
Extension; ELREXFIO; Correction
AGENCY: Food
Determination of Regulatory Review Period for Purposes of Patent Extension; REBYOTA
.gpo.gov]
[FR Doc No: 2025-12342]
DEPARTMENT OF HEALTH AND HUMAN SERVICES
Food and Drug Administration
[Docket No. FDA-2024-E-0402]
Determination of Regulatory Review Period for Purposes of Patent
Extension; REBYOTA
AGENCY: Food and Drug Administration
Determination of Regulatory Review Period for Purposes of Patent Extension; WINREVAIR
.gpo.gov]
[FR Doc No: 2025-12341]
DEPARTMENT OF HEALTH AND HUMAN SERVICES
Food and Drug Administration
[Docket Nos. FDA-2024-E-3582; FDA-2024-E-3583; FDA-2024-E-3584; FDA-
2024-E-3585; FDA-2024-E-3586; FDA-2024-E-3587]
Determination of Regulatory Review
Determination of Regulatory Review Period for Purposes of Patent Extension; [CHOCOLATE TOUCH (PACLITAXEL DRUG COATED PTA BALLOON CATHETER)]
.gpo.gov]
[FR Doc No: 2025-12340]
DEPARTMENT OF HEALTH AND HUMAN SERVICES
Food and Drug Administration
[Docket No. FDA-2024-E-0158]
Determination of Regulatory Review Period for Purposes of Patent
Extension; [CHOCOLATE TOUCH (PACLITAXEL DRUG COATED PTA
Information Collection Being Submitted for Review and Approval to Office of Management and Budget
No. 17-59, WC Docket No. 17-97,
Seventh Report and Order et al., 38 FCC Rcd 5404 (adopted May 18,
2023). On November 21, 2024, the Commission strengthened these
requirements by establishing rules for the use of third parties in the
caller ID
Revising the Duration of Design Certifications
, the NRC would amend its regulations to
revise the duration of DCs, as approved by the Commission in Staff
Requirements Memorandum (SRM)-COMDAW-24-0001, ``Revising the Duration
of Design Certifications,'' dated November 14, 2024. Specifically
Revising the Duration of Design Certifications
-0001, ``Revising the Duration
of Design Certifications,'' dated November 14, 2024. Specifically, this
direct final rule replaces the 15-year duration period for initial DCs
and renewals with a 40-year duration period, both generically and for
each DC currently
Submission for OMB Review; Comment Request; Extension: Rule 204-3
as of March 31, 2024. Based on
this figure, the Commission estimates a total annual burden of 62,525
hours for this collection of information.
Rule 204-3 does not require recordkeeping or record retention. The
collection of information requirements
Government-Owned Inventions; Availability for Licensing
antibodies that inhibit
infection and block dissemination. Sci. Adv. 2023;9:eadg6076.
DOI:10.1126/sciadv.adg6076
Intellectual Property: HHS Reference No. E-041-2024; Provisional
Patent Application 63/640,619, filed on April 30, 2024, and PCT Patent
New Postal Products
.gpo.gov]
[FR Doc No: 2025-12390]
POSTAL REGULATORY COMMISSION
[Docket Nos. CP2022-34; CP2024-407; MC2025-1548 and K2025-1542]
New Postal Products
AGENCY: Postal Regulatory Commission.
ACTION: Notice.
SUMMARY: The Commission is noticing a recent
Determination of Regulatory Review Period for Purposes of Patent Extension; [TOTAL POSTERIOR SPINE SYSTEM (TOPS SYSTEM)]
.gpo.gov]
[FR Doc No: 2025-12339]
DEPARTMENT OF HEALTH AND HUMAN SERVICES
Food and Drug Administration
[Docket No. FDA-2024-E-0447; FDA-2024-E-0446; FDA-2024-E-0445; FDA-
2024-E-0444]
Determination of Regulatory Review Period for Purposes of Patent
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.