Results 1 - 1 of 1
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-217
The extension of the Upper Great Plains (UGP) region's existing Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBP ED) transmission and ancillary services formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules WAUGP-ATRR (Annual Transmission Revenue Requirement), WAUGP-AS1 (Scheduling, System Control, and Dispatch Service), WAUW-AS3 (Regulation and Frequency Response Service), WAUW- AS4 (Energy Imbalance Service), WAUW-AS5 (Operating ReserveSpinning Reserve Service), WAUW-AS6 (Operating ReserveSupplemental Reserve Service), and WAUW-AS7 (Generator Imbalance Service) are set to expire on September 30, 2025. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2030.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.