Western Area Power Administration July 2020 – Federal Register Recent Federal Regulation Documents

Central Valley Project-Rate Order No. WAPA-194
Document Number: 2020-16683
Type: Notice
Date: 2020-07-31
Agency: Department of Energy, Western Area Power Administration
Western Area Power Administration (WAPA) proposes new formula rates and revisions to the existing Energy Imbalance (EI) and Generator Imbalance (GI) rate schedules for the Central Valley Project (CVP). The new rates are associated with two events: Participation in the California Independent System Operator's (CAISO) Energy Imbalance Market (EIM) and aligning CVP's Sale of Surplus Products (SSP) with other WAPA regions.
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-188
Document Number: 2020-15173
Type: Notice
Date: 2020-07-14
Agency: Department of Energy, Western Area Power Administration
The Assistant Secretary for Electricity confirms, approves, and places into effect, on an interim basis, the formula rates for the Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBPED) transmission and ancillary services (Provisional Formula Rates). These rates will be used by Western Area Power Administration's (WAPA) Upper Great Plains Region (UGP) to provide rate data to Southwest Power Pool, Inc. (SPP), the Regional Transmission Organization of which UGP is a member. These new formula rates replace the existing transmission and ancillary services formula rates under Rate Order No. WAPA-170 that expire on September 30, 2020.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.