Western Area Power Administration September 9, 2016 – Federal Register Recent Federal Regulation Documents
Results 1 - 1 of 1
Washoe Project-Rate Order No. WAPA-176
The Western Area Power Administration (WAPA) proposes to extend the existing Washoe Project, Stampede Division, non-firm power formula rate through September 30, 2022. The existing Rate Schedule SNF-7 expires September 30, 2017.