Western Area Power Administration August 2008 – Federal Register Recent Federal Regulation Documents

Loveland Area Projects-Rate Order No. WAPA-141
Document Number: E8-19161
Type: Notice
Date: 2008-08-19
Agency: Department of Energy, Western Area Power Administration
This action is being taken to extend the existing Loveland Area Projects (LAP) transmission and ancillary services formula rates through February 28, 2011. The existing LAP transmission and ancillary services formula rates will expire February 28, 2009, with the exception of the Regulation and Frequency Response service rate which expires May 31, 2011.
Central Valley Project-Rate Order No. WAPA-139
Document Number: E8-19153
Type: Notice
Date: 2008-08-19
Agency: Department of Energy, Western Area Power Administration
This action is to temporarily extend the existing formula rates for power, transmission, and ancillary services for the Central Valley Project (CVP), transmission service on the California-Oregon Transmission Project (COTP), transmission service on the Pacific Alternating Current Intertie (PACI), and third-party transmission service through September 30, 2011. This action also extends the Western Area Power Administration's (Western) recovery methodology of the Path 15 revenue requirement through September 30, 2011. Without this extension, formula rates for power, transmission, and ancillary services for the CVP, transmission service on the COTP, transmission service on the PACI, and third-party transmission service will expire September 30, 2009.
Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-140
Document Number: E8-18953
Type: Notice
Date: 2008-08-15
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western) is proposing revised rates for Pick-Sloan Missouri Basin ProgramEastern Division (P-SMBPED) firm electric and firm peaking power service. Current rates, under Rate Schedules P-SED-F9 and P-SED-FP9, extend through December 31, 2012, but are not sufficient to meet the P-SMBPED revenue requirements. The proposed rates will provide sufficient revenue to pay all annual costs, including interest expenses, and repay required investments within the allowable periods. Western will prepare and make available a brochure that provides detailed information on the proposed rates. The proposed rates, under Rate Schedules P-SED-F10 and P-SED-FP10, are scheduled to go into effect on January 1, 2009, and will remain in effect through December 31, 2013, or until superseded. Publication of this Federal Register notice begins the formal process for the proposed rate adjustment.
Loveland Area Projects-Rate Order No. WAPA-142
Document Number: E8-18949
Type: Notice
Date: 2008-08-15
Agency: Department of Energy, Western Area Power Administration
The Western Area Power Administration (Western) is proposing revised rates for Loveland Area Projects (LAP) firm electric service. LAP consists of the Fryingpan-Arkansas Project (Fry-Ark) and the Pick- Sloan Missouri Basin Program (Pick-Sloan)Western Division, which were integrated for marketing and rate-making purposes in 1989. Current rates, under Rate Schedule L-F7, expire on December 31, 2012, but are not sufficient to meet LAP revenue requirements. The proposed rates will provide sufficient revenue to pay all annual costs, including interest expenses, and repay the required investment within the allowable period. Western will prepare and make available a brochure that provides detailed information on the proposed rates. The proposed rates, under Rate Schedule L-F8, are scheduled to go into effect on January 1, 2009, and will remain in effect through December 31, 2013, or until superseded. Publication of this Federal Register notice begins the formal process for the proposed rate adjustment.
Boulder Canyon Project
Document Number: E8-18575
Type: Notice
Date: 2008-08-12
Agency: Department of Energy, Western Area Power Administration
The Deputy Secretary of Energy approved the Fiscal Year (FY) 2009 Base Charge and Rates (Rates) for Boulder Canyon Project (BCP) electric service provided by the Western Area Power Administration (Western). The Rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay investments within the allowable period.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.