Tennessee Valley Authority May 2023 – Federal Register Recent Federal Regulation Documents

Solar and Battery Programmatic Environmental Impact Statement
Document Number: 2023-10654
Type: Notice
Date: 2023-05-19
Agency: Tennessee Valley Authority, Agencies and Commissions
TVA is working to build an energy system powered by cleaner, more flexible energy, and solar and storage will play a big role. TVA has an expansion target of 10,000 megawatts (MW) of solar by 2035. TVA has identified the need to respond more efficiently and effectively to the growing number of solar and battery projects that will be required to achieve TVA's overall decarbonization goals and aspirations. To meet its obligations under the National Environmental Policy Act (NEPA), TVA is preparing a Programmatic Environmental Impact Statement (PEIS) to develop new guidance and a bounding analysis that will further facilitate solar energy and battery energy storage development on TVA- owned and private lands within the TVA service area. TVA would consider this guidance, including recommended environmental practices and mitigation measures, in its decision-making processes.
Pumped Storage Hydro Programmatic Environmental Impact Statement
Document Number: 2023-10653
Type: Notice
Date: 2023-05-19
Agency: Tennessee Valley Authority, Agencies and Commissions
The Tennessee Valley Authority (TVA) is conducting a study to evaluate increasing pumped storage hydropower (PSH) capacity within its power service area. To meet its obligations under the National Environmental Policy Act (NEPA), TVA is preparing a Programmatic Environmental Impact Statement (PEIS) to evaluate potential new PSH facilities at two locations in Jackson County, Alabama and expansion of the existing Raccoon Mountain PSH Plant in Marion County, Tennessee. Based on the findings of the PEIS, TVA may potentially select one or more sites as the need for long-duration energy storage increases. The PEIS will consider potential environmental and economic impacts from the construction and operation at each site.
Integrated Resource Plan and Environmental Impact Statement
Document Number: 2023-10652
Type: Notice
Date: 2023-05-19
Agency: Tennessee Valley Authority, Agencies and Commissions
The Tennessee Valley Authority (TVA) is conducting a study of its energy resources. The Integrated Resource Plan (IRP) is a comprehensive study of how TVA will meet the demand for electricity in its service territory. TVA's most recent IRP was adopted by the TVA Board in 2019. As part of this new study, TVA will prepare a programmatic Environmental Impact Statement (EIS) to assess the impacts associated with the implementation of the next IRP. The EIS analyzes significant environmental impacts to the combined TVA power service area and the Tennessee River watershed (TVA region) that could result from the targeted power supply mix studied in the IRP. TVA will use the EIS process to elicit and prioritize the values and concerns of stakeholders; identify issues, trends, events, and tradeoffs affecting TVA's policies; formulate, evaluate, and compare alternative portfolios of energy resource options; provide opportunities for public review and comment; and ensure that TVA's evaluation of alternative energy resource strategies reflects a full range of stakeholder input. Public comment is invited concerning both the scope of the EIS and environmental issues that should be addressed as a part of this EIS.
Cheatham County Generation Site Environmental Impact Statement
Document Number: 2023-10651
Type: Notice
Date: 2023-05-19
Agency: Tennessee Valley Authority, Agencies and Commissions
The Tennessee Valley Authority (TVA) intends to prepare an Environmental Impact Statement (EIS) to address the potential environmental impacts associated with the proposed construction and operation of a simple cycle Combustion Turbine (CT) plant and Battery Energy Storage System (BESS) on a parcel of TVA-owned land in Cheatham County, Tennessee. The Cheatham County Generation Site (CHG) would generate approximately 900 Megawatts (MW) and replace generation capacity for a portion of the Cumberland Fossil Plant (CUF) second unit retirement planned by the end of 2028. The CHG CTs would be composed of multiple natural gas-fired frame CTs and natural gas-fired and oil- fired (i.e., dual-fuel) Aeroderivative CTs. CHG would provide flexible and dispatchable transmission grid support and facilitate the integration of renewable generation onto the TVA bulk transmission system, consistent with the 2019 Integrated Resource Plan (IRP). TVA is inviting public comment concerning the scope of the EIS, alternatives being considered, and environmental issues that should be addressed as a part of this EIS.
Sunshine Act Meetings
Document Number: 2023-10107
Type: Notice
Date: 2023-05-10
Agency: Tennessee Valley Authority, Agencies and Commissions
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.