Southwestern Power Administration June 2019 – Federal Register Recent Federal Regulation Documents

Integrated System, Sam Rayburn Dam and Robert D. Willis Rate Schedules
Document Number: 2019-13227
Type: Notice
Date: 2019-06-21
Agency: Department of Energy, Southwestern Power Administration
The Administrator, Southwestern Power Administration (Southwestern), is proposing a two-year extension to the currently approved rate schedules for the Integrated System, the Sam Rayburn Dam, and the Robert Douglas Willis Hydropower Project (Robert D. Willis) for the period October 1, 2019 to September 30, 2021. Southwestern's current Integrated System rate schedules (P-13A, NFTS-13A, and EE-13), Sam Rayburn Dam rate schedule (SRD-15), and Robert D. Willis rate schedule (RDW-15) are set to expire September 30, 2019.
Integrated System Rate Schedule
Document Number: 2019-12753
Type: Notice
Date: 2019-06-17
Agency: Department of Energy, Southwestern Power Administration
The Assistant Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-73, which provides the following Integrated System Wholesale Rates for Hydro Peaking Power (P-13A) Rate Schedule: Rate Schedule P-13A, Wholesale Rates for Hydro Peaking Power.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.