Southwestern Power Administration October 2008 – Federal Register Recent Federal Regulation Documents

Integrated System Rate Schedule Changes
Document Number: E8-25690
Type: Notice
Date: 2008-10-28
Agency: Department of Energy, Southwestern Power Administration
Due to the omission of the P-06A Rate Schedule from the Notice of Proposed Changes to Southwestern Power Administration Rate Schedules and Opportunity for Public Review and Comment published on October 20, 2008 (73 FR 62269), this notice is a resubmission to include both the P-06A and the NFTS-06A Rate Schedule proposals for review and comment. The Administrator, Southwestern Power Administration (Southwestern), has determined that revisions to the Real Power Losses provisions within existing rate schedules P-06 and NFTS-06 are required. Since the proposed rate schedule revisions are limited only to Real Power Losses, the net result of the 2006 Integrated System Power Repayment Studies, which was the basis for the existing rate schedules, will not be altered. Southwestern held several meetings during FY 2008 with customers to discuss the proposed rate schedule revisions and provide opportunity for input in the development of the final rate schedules. As a result of these informal meetings, it was determined that the revised rate schedule provisions can provide cost-savings and operational benefits to Southwestern's transmission customers and are consistent with Federal Energy Regulatory Commission (FERC) Order No. 888.
Integrated System Rate Schedule Changes
Document Number: E8-24868
Type: Notice
Date: 2008-10-20
Agency: Department of Energy, Southwestern Power Administration
The Administrator, Southwestern Power Administration (Southwestern), has determined that revisions to the Real Power Losses provisions within existing rate schedules P-06 and NFTS-06 are required. The Federal Energy Regulatory Commission (FERC) confirmed and approved such rates on February 27, 2007 in Docket No. EF07-4011-000 (118 FERC ]62,162) for the period from October 1, 2006 through September 30, 2010. Since the proposed rate schedule revisions are limited only to Real Power Losses, the net result of the 2006 Integrated System Power Repayment Studies, which was the basis for the existing rate schedules, will not be altered. Southwestern held several meetings during FY 2008 with customers to discuss the proposed rate schedule revisions and provide opportunity for input in the development of the final rate schedules. As a result of these informal meetings, it was determined that the revised rate schedule provisions can provide cost-savings and operational benefits to Southwestern's transmission customers and are consistent with (FERC) Order No. 888.
Robert D. Willis Hydropower Rate Schedules
Document Number: E8-23230
Type: Notice
Date: 2008-10-02
Agency: Department of Energy, Southwestern Power Administration
Pursuant to Delegation Order Nos. 00-037.00, effective December 6, 2001, and 00-001.00C, effective January 31, 2007, the Deputy Secretary has approved and placed into effect on an interim basis Rate Order No. SWPA-59, which increases the power rate for the Robert Douglas Willis Hydropower Project (Willis) pursuant to the following Willis Rate Schedule:
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.